[1]
“ Proposed Changes in the Layout of IBS MSME Production Facilities Using the ARC and ARD Methods”, G-Tech, vol. 8, no. 4, pp. 2578–2585, Oct. 2024, doi: 10.70609/gtech.v8i4.5318.