Evaluation of Permit-to-Work System for Confined Spaces Using Value Stream Mapping and Root Cause Analysis
DOI:
https://doi.org/10.70609/g-tech.v10i2.9356Kata Kunci:
Confined Space, Root Cause Analysis, Safety Management System, Value Stream Mapping, Work PermitAbstrak
The work permit system fulfills clause 6.1.5 in PP No. 50 of 2012 concerning Occupational Health and Safety Management Systems (SMK3) and is required for high-risk activities, such as hot work, confined space operations, work at height, and scaffolding operations. This research aims to analyze waste in the confined space work permit issuance process and determined the root causes. The methods employed are Value Stream Mapping (VSM), to map the permit issuance workflow and identify existing waste. Root Cause Analysis (RCA), to analyze the root causes of waste. The results illustrate process efficiency of the confined space permit issuance process through Future State Mapping and recommendations for potential improvements to reduce waste permit issuance process, prevent work delays and avoiding impediments to company productivity. The waste analysis results of the confined space permit issuance process using Value Stream Mapping (VSM) indicate that the Approval 1 stage is already categorized as Lean Enterprise, with a Process Cycle Efficiency (PCE) value > 30%. However, the Approval 2 and Approval 3 stages are still classified as Un-Lean Enterprise, with PCE values < 30%. Recommended improvements include developing a notification-based website system, prioritizing new permit submissions, enabling mobile approvals, refining the permit issuance SOP and online submission process.
Referensi
Arunizal, S., Wardhani, D. H., & Windarta, J. (2024). Penerapan Value Stream Mapping (VSM) untuk Menurunkan Lead Time Process dan Meningkatkan Kinerja Aktivitas Pengadaan di Site Tambang. 2(3), 141–150.
Balqis, S. N. F., Arninputranto, W., & Khairansyah, M. D. (2024). Perancangan Sistem Informasi Inspeksi Forklift Dan Mesin Bubut Berbasis Web Responsive. Journal of Safety, Health …, 2(1), 51–58. https://jshee.ppns.ac.id/index.php/JSHEE/article/view/21%0Ahttps://jshee.ppns.ac.id/index.php/JSHEE/article/download/21/24
Elya Wirdati, I., Maher Denny, H., & Kurniawan, B. (2015). Analisis Faktor-Faktor Yang Mempengaruhi Kecelakaan Kerja Pada Pekerja Maintenance Elektrikal Dalam Menerapkan Work Permit Di Pt. X Semarang. Jurnal Kesehatan Masyarakat, 3(3), 456–464. http://ejournal-s1.undip.ac.id/index.php/jkm
Fandy, D., & Widiawan, K. (2022). Identifikasi Bahaya, Penilaian Risiko, dan Pengendalian Risiko Kecelakaan Kerja di PT AW Plus UPVC Bali. Jurnal Titra, 10(2).
Febriyani, D., Mulya, W., & Fuadi, Y. (2020). Analisis Penerapan Sistem Safety Permit di Unit PLTU Teluk Balikpapan. Jurnal Keselamatan, Kesehatan Kerja Dan Lindungan Lingkungan, 6(2), 330–339.
Hasanah, S. Z. N., Oetomo, D. S., & Fata, A. F. I. (2023). Pemetaan Penciptaan Nilai Pada Aktivitas Pengadaan Dan Penjualan Skrap Logam Kaleng Menggunakan Value Stream Mapping Untuk Mengurangi Waste Di Pt Anisa Jaya Utama. J. Ilm. Tek, 2(3), 1-14.
Ibrahim, A. I., & Hendrasarie, N. (2022). Pelaksanaan Inspeksi Kesehatan Keselamatan Kerja (K3) pada PT. Pelabuhan Indonesia (Persero) Regional III Subregional Jawa Pelabuhan Tanjung Perak. Indonesian Journal of Applied Science and Technology, 3(2), 53–56.
Ikhsan, M. N. (2025). Identifikasi dan Pengendalian Risiko pada Pekerjaan Lifting Manual Menggunakan Metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC). Journal of Industrial Engineering and Technology, 1(1), 1-8.
Kementerian Ketenagakerjaan, R. (2022). Profil Keselamatan dan Kesehatan Kerja Nasional Indonesia Tahun 2022.
Kusuma, R. D. P., & Hasibuan, S. (2022, April). Implementation of the Lean Service to Increase Productivity in The Procurement of Goods and Services of MRO Companies. In Proceedings of the International Conference on Industrial Engineering and Operations Management Nsukka, Nigeria (pp. 5-7).
Luckyta, D. T., & Partiwi, S. G. (2012). Evaluasi dan Perancangan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) dalam Rangka Perbaikan Safety Behaviour Pekerja (Studi Kasus : PT. X, Sidoarjo). Jurnal Teknik ITS, 1(1), 1–5.
Lwin, H. W., Puttibarncharoensri, P., Elango, D., Jiratchot, C., & Smutkupt, S. (2022). Procurement performance improvement: A case study of non-profit organization in Myanmar. Journal of Management, Economics, and Industrial Organization, 6(3), 62-87.
Maulana, M.F., Santoso, M.Y., Arninputranto, W. 2024. Perancangan Sistem Informasi Work Permit Berbasis Websitepada Perusahaan Industri Pupuk. 8th Conference on Safety Engineering and It’s Application
Ngerndee, C., Leangthanom, C., Gunpai, S., & Rattanadumrongaksorn, D. (2022). Wastes of production process management for Eastern industry. Journal of Business, Innovation and Sustainability (JBIS), 17(4).
Peraturan Pemerintah Nomor 50. (2012).
Primajaya, P., Industri, A., & Ciamis, D. I. (2022). Penerapan lean manufacturing untuk mengidentifikasi pemborosan (waste) pada produksi wajan menggunakan Value Stream Mapping (vsm) pada perusahaan primajaya alumunium industri di ciamis. 109–118.
Pušnik, M., Kous, K., Godec, A., & Šumak, B. (2019). Process evaluation and improvement: A case study of the loan approval process. CEUR Workshop Proceedings, 2508(September), 22–25.
Sani, I. A., Lapatta, N. T., Ngemba, H. R., & Fahlevi, M. F. (2024). Implementation of a Digital-Based Hazardous Work Licensing Management System. The Indonesian Journal of Computer Science, 13(4).
Walenna, A. M. A. A., Wulantari, N., S, E. D., & T, H. A. (2018). Studi Komparatif Hukum Tabdzir dan 7 Waste dalam Proses Manufaktur untuk Meminimalkan Biaya ( cost ). Prosiding Konferensi Integrasi Interkoneksi Islam Dan Sains, 1(September), 2–6.
Yanti, M., Lubis, F. S., Nazaruddin, N., Rizki, M., Silvia, S., & Sarbaini, S. (2022). Production line improvement analysis with lean manufacturing approach to reduce waste at CV. TMJ uses Value Stream Mapping (VSM) and Root Cause Analysis (RCA) methods.
Yusran, M. S. M., Rauf, N., & Padhil, A. (2023). Analisis Waste Pada Produksi Beras Premium Dengan Metode Value Stream Mapping di CV. Coppo Benteng. Jurnal Rekayasa Sistem Industri & Manajemen, 1(1), 1-9.
Unduhan
Diterbitkan
Terbitan
Bagian
Lisensi
Hak Cipta (c) 2026 Aulia Nadia Rachmat, Nurul Ramadhanti, Arief Subekti, Adistia Puji Pramesti

Artikel ini berlisensi Creative Commons Attribution 4.0 International License.








