Proposed Changes in the Layout of IBS MSME Production Facilities Using the ARC and ARD Methods

Authors

  • Daffa Aqilah Nanda Nugraha Universitas Muhammadiyah Gresik, Indonesia
  • Hidayat Hidayat Universitas Muhammadiyah Gresik, Indonesia
  • Yanuar Pandu Negoro Universitas Muhammadiyah Gresik, Indonesia

DOI:

https://doi.org/10.70609/gtech.v8i4.5318

Keywords:

ARC, ARD, Initial and Proposed Layout, Material Handling

Abstract

MSME IBS is a home industry that produces baby sofas, baby bedding, etc. MSME IBS faces material handling problems due to poor layout management factors, as well as the realization of the amount of production that does not reach the predetermined target. The research aims to solve the problem of poor layout to be better using the ARC and ARD methods. The resulting efficiency is 49% with a distance of 1512,5m resulting in a decrease of 51% from 100% of the initial distance with a distance of 3085m after making changes from the initial layout to the proposed layout. For this reason, it requires facility improvements to reduce the distance traveled and the accumulation of goods that make the production flow narrow and far by applying the proposed layout between production rooms in order to reduce material handling.

References

Aji, S. (2022). Implementasi ARC dan ARD untuk Menurunkan OMH pada Desain Ulang Tata Letak Fasilitas Laboratorium. Jurnal Industry Xplore, 125-131.

Alamsyah, D. A., & Suhartini. (2021). Usulan Rancangan Tata Letak Fasilitas Proses Replating Kapal dengan. Prosiding Seminar Nasional Teknologi Industri Berkelanjutan, 01, 65-71.

Aristriyana, E., & Salim, M. I. (2023). Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode ARC Guna Memaksimalkan Produktivitas Kerja pada UKM SB Jaya di Cisaga. Junal Industrial Galuh, 29-36.

Aulia, B., Nurfida, N., Febrianti, T. D., Naomi, J. S., Pratama, F. S., Husyairi, K. A., & Ainun, T. N. (2023). Analisis Tata Letak Fasilitas Toko Prima Freshmart SV IPB melalui Metode Activity Relationship Chart (ARC) dan Total Closeness Rating (TCR). Jurnal Teknologi dan Manajemen Industri Terapan, 128-134.

Jamalludin, F. A., & Hafidz, R. (2020). Metode Activity Relationship Chart (Arc) untuk Analisis Perancangan Tata Letak Fasilitas pada Bengkel Nusantara Depok. Bulletin of Applied Industrial Engineering Theory, 20-22.

Mariboto, D., Anisya, S., Azhar, R. K., Sulaiman, A., Patihawa, A. M., Husyairi, K. A., & Ainun, T. N. (2023). Perancangan Ulang Tata Letak untuk Pengoptimalisasian Ruang pada Toko Ritel RDSP Bogor. Jurnal Teknologi dan ManajemenIndustri Terapan, 135-143.

Maulana, B., & Mundari, S. (2024). Usulan Perancangan Ulang Tata Letak Fasilitas untuk Meningkatkan Efisiensi pada Area Produksi (Studi Kasus: PT. XYZ). Jurnal Serambi Engineering, 9366-9378.

Moengin, P., Saputri, E., & Adisuwiryo, S. (2020). Perbaikan Tata Letak Lantai Produksi dan Penggunaan Alat Material Handling untuk Meminimasi Waktu Produksi Menggunakan Pendekatan Simulasi (Studi Kasus: PT. Sharp Electronics Indonesia). Jurnal Teknik Industri, 8-21.

Mohammad, G. (2023). Usulan Perbaikan Tata Letak Fasilitas Area Produksi dengan Menggunakan Metode Activity Relationship Chart. Jurnal Ilmiah Research and Development Student, 22-29.

Mulyati, D., Zamzam, I., & Mizan, K. (2024). Analisa Tata Letak Fasilitas dengan Metode Activity Relationship Chart (ARC) pada CV. Kilang Padi Riski Perkasa Nagan Raya. Karya Ilmiah Fakultas Teknik, 1-5.

Rivaldi, A. A., & Suseno. (2024). Analisis Tata Letak Fasilitas Produksi dengan Tujuan Mengurangi Biaya Penanganan Material di Arthantra Batu Bata . Jurnal Ilmiah Teknik Industri dan Inovasi, 1-12.

Rizani, N. C., & Adistra, F. D. (2022). Analisa Tata Letak Fasilitas Pabrik Menggunakan Metode Activity Relationship Chart (ARC) di PT. XYZ. Presisi: Jurnal Teknik Mesin, 26-32.

Septiani, T., & Syaichu, A. (2020). Perencanaan Ulang Tata Letak Fasilitas Menggunakan Metode Activity Relationship Chart (ARC). Sistem: Jurnal Ilmu-Ilmu Teknik, 30-41.

Setiyawan, T., Mulyadi, Alexander, Y., & Prastyo, Y. (2024). Proposed Improvement of Facility Layout to Optimize Material Handling Costs with ARC, AAD, ARD Approach at PT. Plating Services. Engineering and Technology Journal, 3509-3515.

Supriyadi, E., & Srikandi, S. A. (2023). Penerapan Perancangan Ulang Tata Letak Fasilitas terhadap Ongkos Material Handling (OMH): Systematic Literature Review. Jurnal TECNOSCIENZA, 237-251.

Warman, F. O., & Mukhtar, M. N. (2024). Analisa Layout Facility Lantai Produksi Menggunakan Metode Activity Relationship Chart (ARC) dan Activity Realationship Diagram di PT. ISUMI. Seminar Nasional Hasil Riset dan Pengabdian, 958-964.

Published

2024-10-16

How to Cite

Proposed Changes in the Layout of IBS MSME Production Facilities Using the ARC and ARD Methods. (2024). G-Tech: Jurnal Teknologi Terapan, 8(4), 2578-2585. https://doi.org/10.70609/gtech.v8i4.5318

Most read articles by the same author(s)

1 2 3 > >>