Analisis Pengendalian Persediaan Pasir Silika dengan Metode EOQ dan JIT pada PT. ABC
DOI:
https://doi.org/10.70609/gtech.v8i4.5361Keywords:
EOQ, JIT, Control of silica sand raw materialsAbstract
PT. ABC is a business that operates in the cement production sector. This company often experiences silica sand raw material inventory below the minimum limit of the safety stock applicable in the company for each month, as a result of which the high frequency of orders causes the cost of ordering to swell. Therefore, an analysis of raw material inventory control must be carried out in order to determine the maximum inventory quantity. EOQ and JIT are techniques in controlling inventory that are relatively easy to minimize the total cost of inventory in the form of total storage and ordering costs. The results obtained with a need for 297,985 tons, the cost charged by the company in one year is Rp. 100,671,298. With the EOQ method, the cost is Rp. 38,236,200 or 62% more efficient. JIT method costs Rp. 15,609,863, or 85% more efficient than the company's policy.
References
Asih, P., Mindhayani, I., & Saputra, H. K. (2023). Pengendalian Persediaan Mur Baut Untuk Perawatan Gerbong Kereta Api Dengan metode Economic Order Quantity (EOQ) dan Just In Time (JIT). Jurnal Rekayasa Industri (JRI), 5(1).
Guntara, D., Irwan, M., Nasution, P., Nasution, A. B., Informasi, S., Sains, F., Teknologi, D., Negeri, I., & Utara, S. (2020). Implementasi Metode Economic Order Quantity Pada Aplikasi Pengendalian Bahan Produksi Sandal Mirado. Jurnal Teknik Informatika, 13(1), 31–42.
Hasanah, D. (2019). Role Of Economic Order Quantity (EOQ) And Just In Time (JIT) In Inventory Control In UD. Risma Jati Mandiri (Doctoral dissertation, Untag 1945 Surabaya).
Kurniawan, V. G. A., Safaruddin, S., & Furwanto, E. (2022). Analisis Penerapan Metode Eoq Pada Manajemen Persediaan Bahan Baku Pasir Besi Di PT. Semen Baturaja. ECOTECHNOPRENEUR: Journal Economics, Technology And Entrepreneur, 1(04), 324-342.
Laoli, S., Zai, K. S., & Lase, N. K. (2022). Dalam Mengelola Manajemen Persediaan Di Grand Katika Gunungsitoli Aplication Of The Economic Order Quantity (Eoq) Reorder Point (Rop) Method, And Safety Stock (Ss) In Managing Inventoy Management At Grand Kartika GunungsitolI. 10, 1269–1273.
Lestari, P., & Darwis, D. (2019). Komparasi Metode Ecomomic Order Quantity Dan Just In Time Terhadap Efisiensi Biaya Persediaan. 7, 30–44. https://doi.org/10.24964/ja.v7i1.703
Malik, Y. (2019). Studi Pengaruh Temperatur Dan Waktu Curing Terhadap Sifat Fisik–Mekanik Semen Geopolimer Berbasis Slag Ferronickel.
Meilani, E. P., & Azizah, F. N. (2023). STRING (Satuan Tulisan Riset dan Inovasi Teknologi) Perbandingan Efektivitas Metode Eoq Dan Jit Dalam Pengelolaan Persediaan Pada Pt Xyz.
Mulyadi, M. (2019). Riset Desain Dalam Metodologi Penelitian (Vol. 16, Issue 1).
Oktarini, D., & Agustiningrum, M. (2022). Analisis Perbandingan Pengendalian Persediaan Sparepart Dengan Metode Tradisional Dan Just In Time Dalam Upaya Mengurangi Pemborosan. http://jurnal.um-palembang.ac.id/integrasi/index
Pradana, V. A., & Jakaria, R. B. (2020). Pengendalian persediaan bahan baku gula dengan metode EOQ dan Just In Time. BINA TEKNIKA, 43–48.
Utami, B., & Setyariningsih, E. (2019). Perbandingan Metode Economic Order Quantity (Eoq) Dan Just In Time (Jit) Terhadap Pengendalian Persediaan Bahan Baku. 143–151.
Quenantari, A. (2016). Analisis Pengendalian Persediaan Bahan Baku Dengan Menggunakan Metode MRP (Material Requirement Planning) Model Dynamic Lot Sizing (Doctoral dissertation, UII, Yogyakarta).
Downloads
Published
Issue
Section
License
Copyright (c) 2024 A. Yassir Ardani, Moh. Jufriyanto, Hidayat Hidayat

This work is licensed under a Creative Commons Attribution 4.0 International License.








