Analysis of Construction Material Waste in Hospital Building Projects Using Pareto and Fishbone Approaches
DOI:
https://doi.org/10.70609/g-tech.v10i3.10119Keywords:
Construction Waste Material, Fishbone Diagram, Pareto MethodAbstract
Material is one of the most important components in construction projects because it serves as the primary element of building structures and significantly influences project costs. Ineffective material management can result in construction material waste, leading to increased costs and reduced resource efficiency. This study aims to identify the dominant waste-generating materials and analyze the factors causing material waste in the Hermana Lembean General Hospital construction project. Data were collected from as-built drawings, material logistics reports, and field interviews. The Pareto method was used to determine the dominant waste materials, while the Fishbone Diagram method was applied to identify the root causes of material waste. The results showed that the total construction material waste generated during the project was 3,951.784 units. Pareto analysis indicated that reinforcing steel (53.21%), wall ceramic 60 × 60 cm (11.38%), lightweight brick (8.49%), and floor ceramic 60 × 60 cm (7.49%) were the dominant waste materials, accounting for more than 80% of the total waste volume. Fishbone Diagram analysis revealed that material waste was mainly caused by machine, method, material, manpower, and measurement factors. These findings can be used to improve material management and reduce waste in future construction projects.
References
Aisyah, R. A., Gunawan, K., & Gazali, A. (2023). Lean Construction Through Waste Register Method: A Case Studies Project in Indonesia. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1303–1313. https://doi.org/10.24928/2023/0204 DOI: https://doi.org/10.24928/2023/0204
Al-Btoosh, J., Albtoush, A.M., & et al. (2023). Material Waste in Construction Projects: Causes and Effects. Journal of Southwest Jiaotong University, 58(3), 121–132. https://doi.org/10.35741/issn.0258-2724.58.3.10. DOI: https://doi.org/10.35741/issn.0258-2724.58.3.10
Budi Nugroho, A. S., et al. (2025). Manajemen Proyek Konstruksi: Pembelajaran Berbasis Kasus Proyek. UGM PRESS.
Fitriani, R. (2022). Analisis Sisa Material, Faktor Penyebab, Dan Tindakan Pencegahan Yang Dapat Dilakukan Pada Proyek Konstruksi. Skripsi Program S1 Teknik Sipil Universitas Tidar.
Gultom, A. J., & Sutandi, A. (2023). Peringkat Dan Faktor Penyebab Waste Material Pada Proyek X Di Serpong. JMTS: Jurnal Mitra Teknik Sipil, 6(2), 223–236. https://doi.org/10.24912/jmts.v6i2.22226. DOI: https://doi.org/10.24912/jmts.v6i2.22226
Hussien, A. (2021). Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice. Journal of Korean Society of Environmental Engineers, 43(6), 453-460. https://doi.org/10.4491/KSEE.2021.43.6.453. DOI: https://doi.org/10.4491/KSEE.2021.43.6.453
Irfanto, R., & Charolin, E. (2024). Implementasi Prinsip Pareto pada Pekerjaan Perbaikan di Proyek Perumahan. Indonesian Journal of Construction Engineering and Sustainable Development (CESD), 7(1), 47–53. https://doi.org/10.25105/cesd.v7i1.20264. DOI: https://doi.org/10.25105/cesd.v7i1.20264
Komarudin, M., & Nugroho, R. E. (2022). Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ. International Journal of Production Management and Engineering, 10(1), 33-50. https://doi.org/10.4995/ijpme.2022.16021. DOI: https://doi.org/10.4995/ijpme.2022.16021
Mokosuli, T. A. P. J., Mangare, J., & Tjakra, J. (2023). Evaluasi Sisa Material Konstruksi Menggunakan Metode Pareto Dan Fishbone Diagram Pada Proyek Pembangunan Rumah Tipe 72/125; Di Perumahan Sawangan Permai. Tekno, 21(85), 849–856. https://ejournal.unsrat.ac.id/v3/index.php/tekno.
Permana Putra, D., Dwiantoro, E., & Hariza, E. R. (2024). Evaluasi Waste Material Pada Proyek Konstruksi Menggunakan Metode Pareto Dan Fishbone Diagram (Studi Kasus: Rusun Ponpes Al-Muslimun Bengkulu Tengah). Jurnal Penelitian Ipteks, 9(2), 258–267.
Ramadhan, S. J., Limanow, M., & Raflyanto, M. R. (2025). Waste Material in Construction Projects: Analyzing Cost, Schedule and Environmental Impacts. Jurnal of Applied Engineering Science, 23(2), 303-313. DOI: https://doi.org/10.5937/jaes0-55779
Sagan, J & Mach, A. (2025). Construction Waste Management: Impact on Society and Strategies for Reduction. Journal of Cleaner Production, Vol 486. https://doi.org/10.1016/j.jclepro.2024.144363. DOI: https://doi.org/10.1016/j.jclepro.2024.144363
Shobirin, M & Nugroho, R. E. (2021). Analysis of Dominant Factors Which Causing Delay and The Appliance of Critical Path Method in Order to Catching Up the Gap Delay in Advance Projects of Work Accessibility. International Journal of Research and Review, 8(1), 461–471.
Situmorang, R. (2023). Buku Ajar Proyek Konstruksi. Pusat Pengembangan Pendidikan dan Penelitian Indonesia.
Sulianta, F. (2025). Diagram fishbone untuk berbagai kebutuhan. Fakultas Teknik, Universitas Widyatama
Susanti, A., & S, S. (2021). EVALUASI WASTE DAN IMPLEMENTASI LEAN CONSTRUCTION PROYEK GEDUNG KAMPUS X. JURNAL RIVET, 1(02), 65-72. https://doi.org/10.47233/rivet.v1i02.331. DOI: https://doi.org/10.47233/rivet.v1i02.331
Syarief, S., Sahadi., & Poernomo, I. (2026). Analysis of Factors Affecting Construction Waste Reduction Using The Structural Equation Modeling Method. International Journal of Technology and Education Research, 4(1), 110–122.
Tafesse, S., Girma, Y. E., & Dessalegn, E. (2022). Analysis of the socio-economic and environmental impacts of construction Waste and management practices. Heliyon, 8(3), e09169. https://doi.org/10.1016/j.heliyon.2022.e09169. DOI: https://doi.org/10.1016/j.heliyon.2022.e09169
Widnyana, I. P., Ardiana, I. W., Wolok, E., & Lasalewo, T. (2022). Penerapan Diagram Fishbone dan Metode Kaizen untuk Menganalisa Gangguan pada Pelanggan PT PLN (Persero) UP3 Gorontalo. Jambura Industrial Review, 2(1), 11–19. https://doi.org/10.37905/jirev.2.1.11-19.
Yuliana, C., Sofia, E., Hidayat, G & et al. (2024). Analysis of Remaining Construction Materials and Their Causal Factors In Building Project. Jurnal Infrastruktur, 10(1), 51-59. DOI: https://doi.org/10.35814/infrastruktur.v10i1.6328
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Grace Yoyce Malingkas, Muhammad Ihsan Jasin, Jessen Granbey Potalangi

This work is licensed under a Creative Commons Attribution 4.0 International License.