Factors Affecting Project Performance and Project Control Measures for Road Construction Projects at PT. X
DOI:
https://doi.org/10.70609/gtech.v10i4.11336Keywords:
Control strategies, Project control, Project performance, Quality management, Relative Importance Index (RII)Abstract
The performance of construction projects is a key factor in the success of modern infrastructure development, particularly in achieving cost, quality, and schedule targets. Road improvement projects at PT X face operational challenges, including delays in the delivery of prefabricated materials and extreme weather conditions, which may reduce daily work productivity. This study aims to identify the dominant factors affecting project performance, determine their relative importance using the Relative Importance Index (RII) method, and formulate appropriate control strategies. A quantitative approach was employed using questionnaires distributed to 30 project personnel, of which 28 valid responses were returned and analyzed. The questionnaire consisted of 15 variables related to factors affecting project performance. The RII values were classified into three importance levels: high, moderate, and low. Although three classification levels were used, the results showed that the analyzed variables fell only into the high and moderate categories. The two most dominant factors were the suboptimal internal quality management system, with an RII of 0.700, and the lack of coordination among parties in quality control, with an RII of 0.686. The proposed control strategies include conducting periodic quality audits, assigning dedicated supervisors at critical project stages, and strengthening integrated materials supply chain management. These strategies are expected to improve project implementation efficiency at PT X and provide a useful reference for future road infrastructure projects.
References
Amun, M. N. I., & Waty, M. (2024). Peringkat Pengaruh Faktor-Faktor SMK3L Terhadap Rumusan masalah Tujuan penelitian Proyek konstruksi. 7(1).
Bagale, S., & Bohara, N. (2024). Factors Affecting Construction Project Performance: Bharatpur Metro Case Study. Journal of UTEC Engineering Management, 2(01), 13–24. https://doi.org/10.36344/utecem.2024.v02i01.002 DOI: https://doi.org/10.36344/utecem.2024.v02i01.002
Fatchurrohman, Zaki, M., Pontan, D., & Kurniyaningrum, E. (2024). Analisis Faktor Penyebab Terjadinya Cost Overrun Pada Proyek Preservasi Jalan. Rang Teknik Journal, 7(2), 367–372.
Faustine, C., & Waty, M. (2022). Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Rumusan masalah Tujuan penelitian. JMTS: Jurnal Mitra Teknik Sipil, 5(3), 681–694.
Kominfo, Si. (2025). Bupati Sidoarjo Sidak Jalan Rusak di Kureksari: Target Perbaikan Sebelum Lebaran, Betonisasi 2025. Sidoarjokab.Go.Id. https://www.sidoarjokab.go.id/berita/detail/1742203811/next
Magdalena, S., & Citra, Z. (2025). Factors Affecting the Occurrence of Cost Overrun Based on Relative Importance Index (RII) on Toll Road Projects. Rekayasa Sipil, 19(1), 120–127. https://doi.org/10.21776/ub.rekayasasipil.2025.019.01.14 DOI: https://doi.org/10.21776/ub.rekayasasipil.2025.019.01.14
Menteri Pekerjaan Umum. (2023). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indoesia Nomor 04/PRT/M/2023 Tentang Perubuhan Atas Perturan Mentrti Pekerjaan Umum Nomor 02/PRT/M/2018 Tentang Pedoman Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) konstruksi Bidan. Menteri Pekerjaan Umum, 1–11.
Nizam, M. K., & Sastra, M. (2020). METODE PELAKSANAAN PEKERJAAN JALAN ( STUDI KASUS : JALAN PAMBANG ± TELUK LANCAR STA 1 + 600 ±. 2(2), 81–89. DOI: https://doi.org/10.35314/tekla.v2i2.1822
Noviyarsi, N., Yulius, M. N., Bakar, Y., & Suryani, E. (2023). Analisis Pengaruh Faktor-Faktor Produktivitas Kerja Proyek Konstruksi Dengan Relative Importance Index (Rii) Dan Regresi Linear Berganda. JISI: Jurnal Integrasi Sistem Industri, 10(1), 27–38. https://doi.org/10.24853/jisi.10.1.27-38 DOI: https://doi.org/10.24853/jisi.10.1.27-38
Pago, M., Badrun, B., & Yunus, A. Y. (2023). Analisis Perencanaan Biaya Konstruksi Jalan Rigid Pevement Ruas Jalan Poros Singki’ Alang-Alang Kab.Toraja Utara. 1(3), 241–244. https://doi.org/10.56326/jptsk.v1i3.1576 DOI: https://doi.org/10.56326/jptsk.v1i3.1576
Pujiastuti, H., Fitrayudha, A., Fariyadin, A., & Hamdani, H. (2023). Identifikasi Karakteristik Teknik Subgrade Jalan ( Studi Kasus Jalan Raya Tanak Awu - Pengembur , Lombok Tengah ). 30(3), 419–428. https://doi.org/10.5614/jts.2023.30.3.10 DOI: https://doi.org/10.5614/jts.2023.30.3.10
Puteri, G. P., Lovenza, V., & Ratnawidjaja, S. (2021). Analisis Faktor-Faktor Yang Mempengaruhi Time Overrun Serta Dampaknya Terhadap Project Delivery. 68–75.
Rafki, D., Dwifitra Y. Jumas, & Heldi. (2024). Analisis Faktor yang Mempengaruhi Kinerja Pelaksanaan Proyek Terhadap Kualitas Konstruksi Jalan Nasional di Provinsi Sumatera Barat. Civil Engineering Collaboration, (January), 1–6. https://doi.org/10.35134/jcivil.v9i2.72 DOI: https://doi.org/10.35134/jcivil.v9i2.72
Rasa, B. T., & Handayani, K. D. (2023). Evaluasi Kinerja Proyek Konstruksi Ditinjau dari Aspek Biaya dan Waktu Menggunakan Metode Earned Value Analysis, Studi Kasus: Pembangunan Gedung Perkantoran Balai Besar Wilayah Sungai (BBWS) Bengawan Solo. Portal: Jurnal Teknik Sipil, 15(2), 12. https://doi.org/10.30811/portal.v15i2.4619 DOI: https://doi.org/10.30811/portal.v15i2.4619
Said, A. (2023). Analyzing the Factors Behind Cost Overruns in Project Management Jamila Irfan Department of Computer Science , University of California. (August).
Sanggor, S. A. M., Tjakra, J., & Pratasis, P. A. K. (2024). Identifikasi Faktor-Faktor Utama Dalam Keberhasilan Proyek Bank Indonesia Jawa Barat Dengan Metode Relative Importance Index. Tahun, 22(87), p-ISSN.
Sugiono, G. J., Antonio, J. K., & Ratnawidjaja, S. (2021). Analisis Faktor-Faktor yang Mempengaruhi Cost Overrun dan Pengaruhnya terhadap Keuangan Proyek Konstruksi di Surabaya. Teknik Sipil, 76–83.
Sundara, D. M., Tiorivaldi, T., & Sodri, A. (2024). Optimalisasi Kinerja Proyek Konstruksi Bangunan Gedung Melalui Building Information Modelling. Jurnal Rekayasa Infrastruktur, 10(2), 66–74. https://doi.org/10.31943/jri.v10i2.271 DOI: https://doi.org/10.31943/jri.v10i2.271
Trianshy, M., Edriani, A. F., & Bahri, S. (2022). Analisis Faktor Cost Overrun Dan Time Overrun Pada Proyek Konstruksi Di Kota Bengkulu. Jurnal Multidisiplin Dehasen (MUDE), 1(2). https://doi.org/10.37676/mude.v1i2.2063 DOI: https://doi.org/10.37676/mude.v1i2.2063
Waris, M., Hasiholan, F., Pekerjaan, K., Republik, U., & Ahmad, S. N. (2025). PERANCANGAN JALAN RAYA - Researchgate. (March).
Widiasanti, I., Saputra, R. J., Handrawan, E. H., & Fallah, A. (2024). Analisis Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi. 6(3), 1199–1207.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Iriene Dewi Kristiani1, Michella Beatrix, Mochamad Firmansyah

This work is licensed under a Creative Commons Attribution 4.0 International License.