ANALYSIS OF WORK EFFICIENCY ON MAINTENANCE OF CRITICAL BELT CONVEYOR MACHINE COMPONENTS USING THE PREVENTIVE MAINTENANCE APPROACH AT PT VARIA USAHA BETON BRANCH BATANG

Authors

  • Sufrotun Khasanah Universitas Selamat Sri
  • Bagus Panuntun Universitas Selamat Sri

DOI:

https://doi.org/10.33379/gtech.v7i2.2326

Keywords:

Pemeliharaan, Belt Conveyor, MTTF, MTTR

Abstract

PT Varia Usaha Beton is a subsidiary of PT Semen Indonesia Beton which produces various kinds of concrete products located in Batang district. With the increasing demand for crushed stone production which is increasing every year, it is necessary to have equipment ready to support an optimal production process. Based on the results of the study, it is known that the average repair time or Mean Time To Repair (MTTR) on 4 critical conveyor belt machines, namely Portable 1 4.97 hours, Ground 2 2.5 hours, Portable 3 1.93 hours, and Return 2.1 hours. Meanwhile, the average value of the repair time interval until the unit is damaged again or Mean Time To Failure (MTTF) respectively is 111.9, 327.25, 321.40, 113.12 hours. Based on the results of the MTTR, Portable 1 was found to have the longest repair time, inversely proportional to Portable 3 which had less repair time on average than the 4 critical belt conveyor machines. Meanwhile, from the MTTF value, it is found that Ground 2 is the longest time interval from repair to damage again, inversely proportional to Portable 1.

References

Ahmadi, Noor (2017). Analisis Pemeliharaan Mesin Blowmould Dengan Metode RCM Di PT.CCAI. Jurnal Optimasi Sistem Industri. Vol 16 No 2 (2017) 167-176.

Ansori, N. dan Mustajib, M.I (2013). Sistem Perawatan Terpadu. Yogyakarta : Graha Ilmu.

Assauri dan Sofjan. (2008). Manajemen Produksi dan Operasi, Edisi Revisi. Jakarta : Fakultas Ekonomi Universitas Indonesia.

Fithri, Prima. (2010). Optimasi Preventive Maintenance dan Penjadwalan Penggantian Komponen Mesin Kompressor dengan Menggunakan Mixed Integer Non Linier Programming dari Kamran. Thesis. Universitas Indonesia, Salemba.

Jardine, A.K.S. and Tsang, A.H.C. (2006). Maintenance, Replacement, and Reliability. Pitman Publishing Corporation, Canada.

Laggoune et al. (2009). Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units. J. Computers and Chemical Engineer-ing 33: 1499-1510.

O’Connor dan Patrick, D.T (2001). Practical Reliability Engineering, Foorth Edition. John Wiley & Ltd. England.

Pranoto, J. et al (2013). Implementasi Studi Preventive Maintenance Fasilitas Produksi Dengan Metode Reliability Centered Maintenance Pada PT. XYZ .e-Jurnal Teknik Industri FT USU, Vol 1, No.3. pp. 18-24.

Septyani, Selly. (2015) Penentuan Interval Waktu Perawatan Komponen Kritis Pada Mesin Turbin di PT PLN (persero) Sektor Pembangkitan Ombilin. Skripsi. Universitas Andalas, Padang.Rachmadi, T., & Kom, S. (2020). The Power Of Digital Marketing (Vol. 1). Tiga Ebook.

Sodikin, Imam. (2008). Penentuan Interval Perawatan Preventif Komponen Elektrik dan Komponen Mekanik yang Optimal pada Mesin Excavator Seri PC 200-6 dengan Pendekatan Model Jardine. Jurnal Teknologi 1(2), 152-154.

Sulistiawan, Agus. (2014). Preventive Maintenance Pada Mesin Filter Air Dengan Menggunakan Metode Age Replacement Sebagai Pengoptimalan Biaya Down Time Di CV.Segar Murni Mojokerto. JTM. Volume 03 Nomor 02 Tahun 2014, 1-10.

Published

2023-03-20

How to Cite

ANALYSIS OF WORK EFFICIENCY ON MAINTENANCE OF CRITICAL BELT CONVEYOR MACHINE COMPONENTS USING THE PREVENTIVE MAINTENANCE APPROACH AT PT VARIA USAHA BETON BRANCH BATANG. (2023). G-Tech: Jurnal Teknologi Terapan, 7(2), 563-569. https://doi.org/10.33379/gtech.v7i2.2326

Most read articles by the same author(s)