Optimization of Electricity Supply in East Nusa Tenggara Through Communal Solar Power Plants: A Case Study of Kupang City Using PVSyst
DOI:
https://doi.org/10.70609/gtech.v8i4.5294Keywords:
Electricity, Solar power plant, PVSyst, Inverter, CO2 emissionAbstract
Certain regions in Indonesia face challenges related to inadequate electricity supply. To address this, it is essential to model and simulate potential solutions before implementation. This study focuses on optimizing electricity provision to resolve a 4 MW deficit in Kupang, East Nusa Tenggara, particularly at night, through the development of a communal Solar Power Plant. PVsyst software is used for analysis to determine the most economical and optimal solar system configuration. The Oelnasi site, selected for its solar radiation levels, land availability, and proximity to the grid, will house 17,411 solar panels covering 28,360 m², with 196 inverters. The system will generate 4.005 kWp of PV power, with a maximum DC power of 3.583 kWDC, and an AC power of 2.940 kWAC. Simulation results indicate that the Oelnasi Solar Power Plant can supply stable nighttime electricity and reduce CO2 emissions by approximately 7,200 tons annually.
References
Artiningrum, T., & Havianto, J. (2019). Meningkatkan Peran Energi Bersih Lewat Pemanfaatan Sinar Matahari. Geoplanart, 2(2), 100–115.
Dwisari, V., Sudarti, S., & Yushardi, Y. (2023). Pemanfaatan Energi Matahari: Masa Depan Energi Terbarukan. OPTIKA: Jurnal Pendidikan Fisika, 7(2), 376–384. https://doi.org/10.37478/optika.v7i2.3322
Ferial. (2015). PLN – LEN Teken PPA PLTS Kupang. Direktorat Jenderal Energi Baru Terbarukan Dan Konservasi Energi. chttps://ebtke.esdm.go.id/post/2015/01/09/754/pln.len.teken.ppa.plts.kupang
Hermawan, S., Nurpulaela, L., Elektro, J. T., & Teknik, F. (2024). Penilaian Produktivitas Pembangkit Listrik Tenaga Surya (PLTS) Terhadap Variabilitas Cuaca : Simulasi PVsyst. 10(1), 641177.
Hidayat, T. N., & Sutrisno, S. (2021). Analisis Output Daya Pada Pembangkit Listrik Tenaga Surya Dengan Kapasitas 10Wp, 20Wp, Dan 30Wp. Jurnal Crankshaft, 4(2), 9–18. https://doi.org/10.24176/crankshaft.v4i2.6013
Kristyadi, T., & Arfianto, T. (2021). Optimasi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Wilayah Pulau Terluar. Infotekmesin, 12(2), 167–174. https://doi.org/10.35970/infotekmesin.v12i2.672
Lee, V. R., & Saputri, F. R. (2024). Simulation of Small-Scale Solar Power Generation System in The Central Java Region: A Case Study of the Cilacap Area. Jurnal Riset Informatika, 6(2), 103–108. https://doi.org/10.34288/jri.v6i2.270
Likadja, F., Galla, W. F., & Kase, D. C. (2022). Analisis Penyambungan Plts Oelpuah 5 Mwp Ke Sistem Saluran Udara Tegangan Menengah (Sutm) 20 Kv Pt. Pln Unit Layanan Kupang. Jurnal Media Elektro, XI(1), 17–24. https://doi.org/10.35508/jme.v0i0.6592
Lorent, V., Akbar, A. M., & Saputri, F. R. (2024). Analyzing the Feasibility of Photovoltaic Solar Systems in the Parking Area of Universitas Multimedia Nusantara: A PVSyst Simulation-based Investigation. G-Tech : Jurnal Teknologi Terapan, 8(3), 1544–1550. https://ejournal.uniramalang.ac.id/index.php/g-tech/article/view/1823/1229
Nakmofa, M. E., Kallau, J. N., & Amheka, A. (2018). Kajian Kualitas Lingkungan Fisik-Kimia Akibat Pengoperasian Pembangkit Listrik Tenaga Surya Terpusat Di Desa Oelpuah Kecamatan Kupang Tengah Kabupaten Kupang. Bumi Lestari Journal of Environment, 18(2), 50. https://doi.org/10.24843/blje.2018.v18.i02.p02
Nurjaman, H. B., & Purnama, T. (2022). Pembangkit Listrik Tenaga Surya (PLTS) Sebagai Solusi Energi Terbarukan Rumah Tangga. Jurnal Edukasi Elektro, 6(2), 136–142. https://doi.org/10.21831/jee.v6i2.51617
Prabowo, Y. A., Triwiyatno, A., & Sumardi, S. (2013). Perancangan dan simulasi sistem tracking panel surya dua derajat kebebasan menggunakan metode kendali logika fuzzy. Energi, 2(3), 463–470.
Pranata, N., & Saputri, F. R. (2024). Renewable Energy in Indonesia: A Critical Review of Sources, Technologies, and Strategies for Clean Energy Transition. Journal of System and Management Sciences, 14(7), 122–144. https://doi.org/10.33168/jsms.2024.0707
Qasimi, A. B., Toomanian, A., Nasri, F., & Samany, N. N. (2023). Genetic algorithms-based optimal site selection of solar PV in the north of Afghanistan. International Journal of Sustainable Energy, 42(1), 929–953. https://doi.org/10.1080/14786451.2023.2246081
Rizal, C. (2017). Penggunaan Solar Sel Sebagai Pembangkit Listrik Tenaga Surya. Jurnal Teknik Elektro, 7(2), 7–17. https://jurnal.unpal.ac.id/index.php/jte/article/view/228
Windarta, J., Handoko, S., Irfani, K. N., Masfuha, S. M., & Itsnareno, C. H. (2021). Analisis Teknis dan Ekonomis Pembangkit Listrik Tenaga Surya Off-grid Menggunakan Software PVSyst untuk Usaha Mikro Kecil dan Menengah (UMKM) Coffeeshop Remote Area. Teknik, 42(1), 290–298. https://doi.org/10.14710/teknik.v42i3.40242
Zaenal, A., Jamaaluddin, Ahfas, A., Hadidjaja, D., & Falah, A. (2024). Analisa Kapasitas Pembangkit Listrik Tenaga Surya (PLTS) untuk Pengering Kupang. Techné : Jurnal Ilmiah Elektroteknika, 23(1), 55–64. https://doi.org/10.31358/techne.v23i1.415
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Fahmy Rinanda Saputri, Indra Hadi Prasetya, Agie Maliki Akbar

This work is licensed under a Creative Commons Attribution 4.0 International License.









