Modeling And Cost Planning For The Tanjungpandan District Court Building Project Using Building Information Modeling (BIM) Method

Authors

  • Ahmad Yudi Institut Teknologi Sumatera, Indonesia
  • Mohammad Ihsan Firmansyah Institut Teknologi Sumatera, Indonesia
  • Kirtinanda P. Institut Teknologi Sumatera, Indonesia
  • Ayu Sinta Aprilia Institut Teknologi Sumatera, Indonesia
  • Siti Rahma Institut Teknologi Sumatera, Indonesia

DOI:

https://doi.org/10.70609/gtech.v9i2.6437

Keywords:

Design, Autodesk Revit, Quantity Take off, Cost

Abstract

Infrastructure development in Indonesia is currently in a fairly massive development phase. To support this, the government of the Republic of Indonesia improves the quality of national development by continuing to adapt to existing technological developments, one of which is Building Information Modeling (BIM). In this case, the use of BIM in planning and designing a construction object becomes easier because it can be done simultaneously. In addition, the design produced through the BIM method also contains data and information that can be used in other phases of construction. One of the data produced is the quantity of materials that can be used to estimate construction costs. In this study, the use of the BIM method is intended to determine the comparison of the costs generated to the cost of conventional methods of the project. The results of the cost calculation obtained by the BIM method are cumulatively -2,06% lower than the conventional method. There is a varying cost deviation for each work item, with the smallest cost deviation being +0,48% for beam structure work and the largest cost deviation being +126,26% for stair work.

References

Adhitama, A. R., Ratnaningsih, A., & Kriswardhana, W. (2020). Penerapan Metode Building Information Modeling (BIM) Pada Pembangunan Gedung Integrated Laboratory for Natural Science and Food Technology Universitas Jember. Jurnal Rekayasa Sipil Dan Lingkungan, 4(2), 113–119. https://doi.org/10.19184/jrsl.v4i2.11683

Albab, A. U., & Erizal. (2021). Analisis Kinerja Waktu dan Penerapan Building Information Modeling pada Proyek Pembangunan Jasmine Park Apartment Bogor. Jurnal Teknik Sipil Dan Lingkungan (JSIL), 6(1), 11–22. https://doi.org/10.29244/jsil.6.1.11-22

Anjani, A., Bayzoni, Husni, H. R., & Niken, C. (2022). Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung. Journal Rekayasa Sipil Dan Desain (JRSDD), 10(1), 87–98.

Apriansyah, R. (2021). Implementasi Konsep Building Information Modeling (BIM) Dalam Estimasi Quantity Take Off Material Pekerjaan Struktural.

Berlian P., C. A., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu,Biaya dan Sumber Daya Manusia Antara Metode Building Information Modeling (BIM) dan Konvensional (Studi kasus : Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil, 5(2), 220–229.

Budi, M. R. S., Suhartinah, & Manggala, A. S. (2018). Perbandingan Estimasi Anggaran Biaya dan Schedule Proyek Pembangunan Rumah Sakit Al Huda Banyuwangi Menggunakan Metode SNI dan Metode BOW. Jurnal Rekayasa Infrastruktur Hexagon, 3(2), 27–35. https://doi.org/https://doi.org/10.32528/hgn.v3i2.2914

Fadhilah, A., Purwanto, E., & Basuki, A. (2022). Aplikasi Building Information Modeling (BIM) Dalam Perancangan Bangunan Gedung. Jurnal Matriks Teknik Sipil, 10(3), 264–271. https://doi.org/10.20961/mateksi.v10i3.55999

Ardiansyah, I. P. (2024). Implementasi Konsep Building Information Modeling (BIM) 5D Pada Perencanaan Konstruksi Jembatan (Studi Kasus : Jembatan Sungai Kampar Tol Rengat - Pekanbaru).

Ikhwan, N. A. H., & Herzanita, A. (2024). Implementasi Konsep BIM Dalam Perhitungan Volume Pada Struktur Atap Untuk Pekerjaan Beton dan Baja Studi Kasus : Lantai 5 Proyek Gedung Extension Fakultas Ilmu Komunikasi , Universitas Pancasila. Jurnal Artesis, 4(2), 147–155.

Irawan, D. O. P., Trisiana, A., & Sukmawati, S. (2021). Penerapan Building Information Modeling (BIM) Dalam Analisis Waktu Dan Anggaran Biaya Struktur dan Arsitektur (Studi Kasus : Gedung Fakultas Ilmu Komputer Universitas Jember). Journal of Applied Civil Engineering And Infrastructure Technology (JACEIT), 2(1), 35–39. http://journal.isas.or.id/index.php/JACEIT

Lavanya, N., & Prasad, D. S. V. (2017). 3D Modeling and Clash Deduction of PBS-Television Center Hawaii. World Journal of Research and Review (WJRR), 4(6), 19–24.

Saputra, M. (2023). Penerapan Konsep Building Information Modeling (BIM) Dalam Perancangan DED dan Estimasi Quantity Take Off Pada Gedung Bertingkat (Studi Kasus : Proyek Pembangunan Gedung dan Pagar Kantor Wilayah DJBC Sumatera Bagian Barat).

Nugrahini, F. C., & Permana, T. A. (2020). Building Information Modelling (BIM) dalam Tahapan Desain dan Konstruksi di Indonesia, Peluang Dan Tantangan : Studi Kasus Perluasan T1 Bandara Juanda Surabaya. AGREGAT, 5(2), 459–467. https://doi.org/10.30651/ag.v5i2.6588

Pantiga, J., & Soekiman, A. (2021). Kajian Implementasi Building Information Modeling (BIM) di Dunia Konstruksi Indonesia. Rekayasa Sipil, 15(2), 104–110. https://doi.org/10.21776/ub.rekayasasipil.2021.015.02.4

Pratama, R. E., Hendriyani, I., & Pratiwi, R. (2024). Implementasi Konsep Building Information Modelling ( BIM ) 5D Pada Pekerjaan Struktur Untuk Efisiensi Biaya Proyek. Jurnal Teknologi Terpadu, 12(2).

Ramdani, I., Paikun, Rozandi, A., Budiman, D., & Vladimirovna, K. E. (2022). Implementasi Building Information Modeling (BIM) Pada Proyek Perumahan. Jurnal TESLINK : Teknik Sipil Dan Lingkungan, 4(1), 1–15. https://doi.org/10.52005/teslink.v4i1.105

Sangadji, S., Kristiawan, S. A., & Saputra, I. K. (2019). Pengaplikasian Building Information Modeling (BIM) Dalam Desain Bangunan Gedung. Matriks Teknik Sipil, 7(4), 381–386. https://doi.org/10.20961/mateksi.v7i4.38475

Siregar, H. K. A., Harahap, S., & Puspita, N. R. (2022). Analisa Perbandingan Nilai Harga Satuan Pekerjaan (AHSP) Dengan Nilai Harga Standar Nasional Indonesia (Sni) Pada Pekerjaan Pembangunan Gedung / Ruang Baru Puskesmas Padangmatinggikota Padangsidimpuan. Statika, 5(1), 60–70.

Suasira, I. W., Tapayasa, I. M., Santiana, I. M. A., & Wibawa, I. G. S. (2021). Analisis Komparasi Metode Building Information Modeling (BIM) Dan Metode Konvensional Pada Perhitungan RAB Struktur Proyek (Studi Kasus Pembangunan Pasar Desa Adat Pecatu). Jurnal Teknik Gradien, 13(01), 12–19.

Sugiyono. (2013). Metode Penelitian Kuantitatif Kualitatif Dan R&D. Alfabeta.

Downloads

Published

2025-04-02

How to Cite

Modeling And Cost Planning For The Tanjungpandan District Court Building Project Using Building Information Modeling (BIM) Method. (2025). G-Tech: Jurnal Teknologi Terapan, 9(2), 578-588. https://doi.org/10.70609/gtech.v9i2.6437