Technical Design of Pit B Mining PT Indo Muro Kencana Murung Raya Regency, Central Kalimantan Province
DOI:
https://doi.org/10.70609/g-tech.v9i4.7790Keywords:
Pit Design, Waste Dump Design, Reserve Difference Calculation, Open Pit Mining, Mining Technical DesignAbstract
This research aims to make a technical design for mining in Pit B, an area planned by PT Indo Muro Kencana to be exploited based on the evaluation of economic ore reserves. Pit B is an area that has never experienced mining activities before. The mine design method involves a technical design process that considers geotechnical, topography, and reserve data aspects to determine an economical and technically feasible mining deadline. The purpose of this method is to produce an optimal and safe mining design, in order to maximize the extraction of mineral reserves by paying attention to work safety. The research method applied is quantitative, used to design pit and waste dump designs and calculate the difference in reserves between the researcher's design results and the company's pitshell data using surpac software. Descriptive analysis is carried out to explain the design process and calculation of the proposal. The pit geometry parameters include a level height of 15 meters, a level width of 5 meters, a slope of 60°, and a ramp width of 15 meters with a slope of 10%, according to the company's operational standards. The results of the calculation of the reserve volume showed that ore amounted to 326,809 tons and waste 4,911,173 tons. The reserve difference between the design and pitshell data is still within the company's tolerance limit of 33%, so this technical design is suitable as the basis for mining operations in the field.
References
Abd Muttakin. (2023). Technical Design and Mining Scheduling (Mine Schedulling) in the Fourth Quarter of 2022 PT. Bumi Bara Makmur Mandiri Pit Tiga Batin Xxiv District, Batanghari Regency, Jambi Province. In Abd Muttakin.
Azwari, A. (2015). Effective and Efficient Mining Road Design. Jakarta: Mineral and Mineral Education and Training Center.
Bargawa, W. (2018). Mine Planning. Bandung: ITB Publishers.
Dasa, A., Erwin, A., Mili, M. Z., & Ido, I. (2023). Nickel Mining Pit Design at Pit 1 Block Pullumea PT Keinz Ventura Central Sulawesi Province. Journal of Mining Technology Research, 3(1), 45–53.
Falah, R., Asof, M., & Mining, J. T. (2019). Gold Mining Technical Plan in Serujan 05 Pt. Indo Muro Kencana Gold Mining Technical Plan in Serujan 05 Pt. Indo Muro Kencana. Journal of Mining, 3(2), 1–7.
Gumelar, B. B. G., Iswandaru, & Zaenal. (2022). Technical Design of Gold Mining at PT DEF in Simpenan District, Sukabumi Regency, West Java Province. Bandung Conference Series: Mining Engineering, 2(1), 142–149. https://doi.org/10.29313/bcsme.v2i1.1592
Ministry of Energy and Mineral Resources. (2018). Decree of the Minister of Energy and Mineral Resources Number 1827 K/30/MEM/2018 concerning Guidelines for the Implementation of Good Mining Engineering Principles.
Noor, A. W., & Sidiq, H. (2023). Technical Design of Coal Mining Pushback in Pit Block 01 PT. Borneo Alam Semesta Site PT. Binuang Mitra Bersama Lokpaikat District, Tapin Regency, South Kalimantan Province. 2023(November), 58–67.
Putrawiyanta, I. P. (2024). Perhitungan Volume Dengan Permodelan Software Terramodel Terhadap Stockpile Batubara: Volume Calculation Using Terramodel Software Modeling On Coal Stockpile. Journal of Mining Engineering, 24(1), 1–9. https://doi.org/10.36873/jtp.v24i1.12316
Putrawiyanta, I. P., Taruna, Y., & Lauriandro, A. A. (2023). The calculation of coal resources at PT. Fontana Resources Indonesia, North Barito Regency, Central Kalimantan. Angkasa: Scientific Journal of Technology, 15(1), 45-54.
Rana Antariksa D, Yuliadi, & Zaenal. (2021). Geometry Design of the Waste Dump Final Slope Plan for the Displacence of the Bedrock of the Waste Dump Area of PT X, Palimanan District, Cirebon Regency, West Java Province. Journal of Mining Engineering Research, 1(1), 22–29. https://doi.org/10.29313/jrtp.v1i1.29
Siahaan, G. W. (2022). Technical Design of the Western Lotus Pit and Disposal on CV. Biological Mother. Thesis. University of Palangka Raya.
Supandi., Sidiq, H., & Pangacella, B. (2023). Mine Planning Textbook. Deepublish, 1, 1–246.
Prabowo, B. A., Wijaya, R. A. E., & Sidiq, H. (2020). Technical Design Of Short-Term Coal Mining Pit 9-10 At PT Madhani Talatah Nusantara Site Project Asam Asam Tanah Laut South Kalimantan. Mining Insight, 01(01),11–19 https://journal.itny.ac.id/index.php/mining/article/view/1836
Yulhendra, D. (2019). Technical Design of Limestone Mining at WIUP OP 412 Ha at PT Semen Padang. Build a mine. 4(3).233-246
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Monica Anastacia Oktavia Talayuk, Deddy NSP Tanggara, I Putu Putrawiyanta, Novalisae Novalisae, Yos David Inso

This work is licensed under a Creative Commons Attribution 4.0 International License.