Analysis of the Cost Budget Plan Requirements for the Construction of Ketegan Village Office, Pasuruan

Authors

  • Moh. Ilyasil Ghafur Universitas Annuqayah, Indonesia
  • Aditya Dandy Firatama Universitas Annuqayah, Indonesia
  • Alfan Nuris Siddiqi Universitas Annuqayah, Indonesia

DOI:

https://doi.org/10.70609/g-tech.v10i1.8458

Keywords:

Cost Budget Plan, Work Duration, Office, Construction, Ketegan Village

Abstract

Village offices are essential for the daily functioning of the community, especially in Ketegan Rejoso Pasuruan village. To ensure the development and prosperity of the village, the local government must optimize its efforts. The preparation of the construction budget plan is a key aspect, particularly when it comes to involving the community in the planning process. This research aims to obtain a cost budget plan and project timeline for the renovation of the Ketegan Village Office, ensuring that the development process is structured and organized. The Cost Budget Plan calculations in this study refer to the Unit Price Analysis of Pasuruan City in 2023, as well as a survey of building materials and bestek (technical specifications) drawings provided. The study found that the Ketegan Village Office, a single-story building with an area of 100,75 m², will be in Ketegan Village, Rejoso District, Pasuruan Regency. The total cost required for this construction project is IDR. 173.723.000,00, with the construction scheduled to take 2 months or 60 calendar days, assuming a 7-day workweek. Achieving accurate results requires a comprehensive understanding of all the stages involved in calculating the budget plan.

References

Anwar, A. P., & Melawati, F. (2024). Efektivitas Pengelolaan Dana Desa Dalam Pembangunan Infrastruktur Perdesaan Di Desa Cinengah Kecamatan Rongga Kabupaten Bandung Barat. Int. https://doi.org/10.30737/interaksi.v1i1.5174

Arrif’aniy, F. F. Z., Sumarni, S., & Isnantyo, F. D. (2024). Pandangan Pemuda mengenai Isu-Isu Pekerjaan Pembangunan Infrastruktur (Studi Metode Photovoice) Kasus di Desa Kebak Kabupaten Karanganyar. Jurnal Penyuluhan, 20(02), 214–229. https://doi.org/10.25015/20202446161

Dewi, M. S. (2022). Implementasi Pendekatan Participatory Development Planning Oleh Pemerintah Desa Setelah Diundangkannya Undang-Undang Nomor 6 Tahun 2014 Tentang Desa. Jurnal Hukum Lex Generalis. https://doi.org/10.56370/jhlg.v3i8.292

Eka Nurus Sakinah, I Nyoman Dita Pahang Putra, & Anna Rumintang. (2021). Analisis Kelayakan Ekonomi Pada Pembangunan Perkantoran Tower Poros Maritim Surabaya. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 10(2), 224–231. https://doi.org/10.22225/pd.10.2.2773.224-231

Hasina, H., Hawa, S., Ode, L., Zulfitrah, M., Amin, M. I., Five, B. P., & Loding, A. (2023). Perencanaan Ruangan dan Pagar Kantor Desa di Desa Lamomea Kecamatan Konda Kabupaten Konawe Selatan. AMMA: Jurnal …, 2(3), 242–246.

Kauders, P. G. (2022). Chapter 4 - Cost estimating. In M. Nouri & E. Lucke (Eds.), Life Cycle of a Process Plant (pp. 75–99). Elsevier. https://doi.org/https://doi.org/10.1016/B978-0-12-813598-3.00001-X

Kumalasari, I., Akbariah, L., Natasha, C. E., & Nashihah, D. (2023). Mengukur Sentimen Asn: Tinjauan Kepuasan Asn Terhadap Perencanaan Strategis Dalam Pembangunan Infrastruktur Pemerintah Daerah Di Kabupaten Pamekasan. Journal of Social and Economics Research. https://doi.org/10.54783/jser.v5i2.134

Kusuma, Y. A., & Khoiroh, S. M. (2023). Analysis of Village Infrastructure Project Success Factors by Considering Implementation Risks. Motivection Journal of Mechanical Electrical and Industrial Engineering. https://doi.org/10.46574/motivection.v5i2.228

Ningsih, W., & Anggraeni, W. A. (2023). Determinan Akuntabilitas Pengelolaan Dana Desa Dengan Sistem Keuangan Desa Sebagai Pemediasi. Jurnal Akuntansi Manado (Jaim). https://doi.org/10.53682/jaim.vi.7635

Pamuji, K., Ardhanariswari, R., & Asyik, N. (2020). Peningkatan Kapasitas BPD Sebagai Mitra Pemerintah Desa Dalam Pengembangan Potensi Pariwisata Desa Di Kecamatan Baturaden. Borobudur Journal on Legal Services. https://doi.org/10.31603/bjls.v1i2.3992

Pramono, B., Khadavi, K., & Peli, M. (2024). Pengaruh Kompetensi Manajer Proyek Terhadap Kinerja Waktu Penyelesaian Proyek Konstruksi Di Kota Payakumbuh. Sigma Teknika. https://doi.org/10.33373/sigmateknika.v7i2.6750

Putra, K. W., & Mursyidah, L. (2023). Perencanaan Pembangunan Infrastruktur Desa Kalidawir Kecamatan Tanggulangin Kabupaten Sidoarjo. Journal of Governance and Local Politics (Jglp). https://doi.org/10.47650/jglp.v5i2.958

Ratag, K. A., Malingkas, G. Y., & Tjakra, J. (2021). Perbandingan Rencana Anggaran Biaya Antara Metode SNI Dengan Metode AHSP Pada Proyek Gedung Pendidikan Fakultas Teknik Jurusan Teknik Sipil Universitas Sam Ratulangi. Tekno, 19(79), 299–305.

Riagung Sartiyana, I. K., Nugroho, L. D., & Muhammadun, H. (2025). Time and Cost Control Analysis of the Construction of the Joyoboyo Zoo Intermodal Terminal Pedestrian Tunnel Using the Critical Path Method. International Journal on Advanced Technology Engineering and Information System (Ijateis). https://doi.org/10.55047/ijateis.v4i1.1566

Rohim, A., Witjaksana, B., & Tjendani, H. T. (2024). Estimated Cost and Time for Completion of the Bali GX Office and Co Working Project Using the Earned Value Method. International Journal of Science Technology & Management. https://doi.org/10.46729/ijstm.v5i3.1076

Saad, S., Alaloul, W. S., & Ammad, S. (2022). Fundamentals of Construction Project Management. Fundamentals of Construction Project Management, 1st Editio, 21. https://doi.org/https://doi.org/10.1201/9781003190134-1

Simbolon, D. S. et al. (2021). Peranan Pemerintah Desa Dalam Pembangunan Infrastruktur. Jurnal Kewarganegaraan, 5(2), 295–302. https://doi.org/10.26418/j-psh.v12i1.46323

Thakkar, J. J. (2022). Project Time--Cost Trade-Off. In Project Management: Strategic and Operational Planning (pp. 237–257). Springer Nature Singapore. https://doi.org/10.1007/978-981-15-3695-3_8

Xu, D. M. (2024). Effectively Utilizing Infrastructure to Achieve Economic and Societal Growth in Developing Countries. Journal of Education, Humanities and Social Sciences, 38, 1–7. https://doi.org/10.54097/cfrw1x66

Yu Hao, A. C., Lai, C. H., Su, H. T., Then, Y. L., Tay, F. S., Hui Then, P. H., & Chen Yi, N. L. (2020). Cost estimation methods for internet infrastructure deployment in Rural Sarawak: a review. Indonesian Journal of Electrical Engineering and Computer Science, 19(3), 1375–1383. https://doi.org/10.11591/ijeecs.v19.i3.pp1375-1383

Zakariyya, B., Ridwan, A., & Suwarno, S. (2020). Analisis Biaya Dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek Dengan Metode Earned Value. Jurnal Manajemen Teknologi & Teknik Sipil. https://doi.org/10.30737/jurmateks.v3i2.1197

Downloads

Published

2026-01-02

How to Cite

Analysis of the Cost Budget Plan Requirements for the Construction of Ketegan Village Office, Pasuruan. (2026). G-Tech: Jurnal Teknologi Terapan, 10(1), 76-85. https://doi.org/10.70609/g-tech.v10i1.8458

Most read articles by the same author(s)