Exploration of BIM Automatic Quantity Take Off for Contractor on Bridge Structural Model
DOI:
https://doi.org/10.70609/g-tech.v10i1.8735Keywords:
Building Information Modeling (BIM), Digital Construction, Quantity Take Off, Level of Development (LOD), Bridge StructureAbstract
The implementation of Building Information Modelling (BIM) in Indonesia’s construction industry has grown steadily, but it mainly focuses on the planning stage. One important function of BIM, automated quantity take-off (QTO), has great potential benefits for contractors during the construction phase. However, its use often faces challenges due to poor model quality. This study explores the implementation of BIM-based automated QTO in a bridge construction project to support digital construction practices from a contractor’s viewpoint. A structured modeling approach that follows Level of Development (LOD) 350 was used to improve model quality, ensure data consistency, and allow reliable quantity extraction and shop drawing generation within the BIM environment. The QTO results for the concrete and reinforcement materials in this analysis showed a total concrete volume of 2,075.30 m³, and the reinforcement volume was 381,548.21 kg. The findings also highlight the need to align modeling practices with the requirements of the construction phase to fully take advantage of BIM. Overall, BIM-based automated QTO can enhance construction performance, reduce material waste, and improve contractor decision-making, providing evidence to support broader industry adoption and informing future guidelines and policy initiatives for digital construction in Indonesia.
References
Abma, V., Farhana, A., & Rachmawati, S. (2024). Cash flow simulation planning based on building information modeling for construction projects. AIP Conference Proceedings, 3114(1). https://doi.org/10.1063/5.0202242
Abma, V., Nastiti, A. R., & Ramadhani, F. (2025). Barriers to implementing Common Data Environment (CDE) in the construction phase of BIM-based projects. Teknisia, 29(2), 94–102. https://doi.org/10.20885/teknisia.vol29.iss2.art3
Ashurmamadova, S., & Rexhepi, G. (2024). Building A Sustainable Future: Adoption, Barriers, And Pathways To Progress In Sustainability-Case Of Sustainable Construction. https://doi.org/10.13140/RG.2.2.33469.06889
Atmajaya, W., & Abma, V. (2025). Eksplorasi quantity take off (QTO) dan dampak terhadap biaya berbasis 5D BIM (Vol. 4, Issue 23).
Cepni, Y., & Akcamete, A. (2021). Enhancing BIM-Based QTO Using Visual Programing. Proceedings of the 2021 European Conference on Computing in Construction, 2, 229–236. https://doi.org/10.35490/ec3.2021.164
Chen, B., Jiang, S., Qi, L., Su, Y., Mao, Y., Wang, M., & Cha, H. S. (2022). Design and Implementation of Quantity Calculation Method Based on BIM Data. Sustainability (Switzerland), 14(13). https://doi.org/10.3390/su14137797
Chen, G., Feng, Q., Jiang, C., Zhang, S., & Li, Q. (2025). Towards Digital Transformation in the Construction Industry: A Selection Framework of Building Information Modeling Lifecycle Service Providers (BLSPs). Systems, 13(9). https://doi.org/10.3390/systems13090816
Eldeep, A. M., Farag, M. A. M., & Abd El-hafez, L. M. (2022). Using BIM as a lean management tool in construction processes – A case study: Using BIM as a lean management tool. Ain Shams Engineering Journal, 13(2), 101556. https://doi.org/10.1016/j.asej.2021.07.009
Elyano, M. R., & Yuliastuti. (2021). Analysis of clash detection and quantity take-off using BIM for warehouse construction. IOP Conference Series: Earth and Environmental Science, 794(1). https://doi.org/10.1088/1755-1315/794/1/012012
Ferial, R., Hidayat, B., Pesela, R. C., & Daoed, D. (2022). Quantity take-off berbasis building information modeling (bim) studi kasus: gedung bappeda padang. Jurnal Rekayasa Sipil (JRS-Unand), 17(3), 228. https://doi.org/10.25077/jrs.17.3.228-238.2021
Fürstenberg, D., Hjelseth, E., Klakegg, O. J., Lohne, J., & Lædre, O. (2024). Automated quantity take-off in a Norwegian road project. Scientific Reports, 14(1). https://doi.org/10.1038/s41598-023-50486-6
Gustian, E., Milyardi, R., & Lesmana, C. (2022). Analysis of Benefits and Barriers Factors in the Implementation of Building Information Modeling (BIM) in Building Construction for Contractor. Jurnal Teknik Sipil Dan Perencanaan, 24(2), 158–167. https://doi.org/10.15294/jtsp.v24i2.37026
Kiet, T. T., Kha, T. T., & Thuan, T. C. (2023). Analyzing problematic issues of building information modeling (BIM) implementation by contractors. IOP Conference Series: Earth and Environmental Science, 1226(1). https://doi.org/10.1088/1755-1315/1226/1/012002
Li, P. (2021). Research on the application of BIM technology in bridge design. Journal of Physics: Conference Series, 2023(1). https://doi.org/10.1088/1742-6596/2023/1/012002
Liu, G., Ma, Z., Li, J., Li, S., Zhou, X., & Song, Y. (2024). Framework of Digital Lean Construction and Implementation of Its Management Platform for the Construction Phase. Journal of Construction Engineering and Management, 150(6). https://doi.org/10.1061/jcemd4.coeng-14164
Meisaroh, M., & Husin, A. E. (2021). Analysis of Key Success Factors Using RII Method on The Implementation Building Information Modeling (BIM)-Based Quantity Take-Off to Improve Cost Performance Hospital Structure. www.solidstatetechnology.us
Meléndez, W., Saavedra, R., & Garcés, G. (2024). Quantity take-off in rough construction of high-rise buildings based on cad and bim methodologies: A case study. Annual Conference of the International Group for Lean Construction, IGLC, 32, 793–806. https://doi.org/10.24928/2024/0236
Nafiyah, R., & Martina, N. (2022). Analisis quantity takeoff pada pekerjaan struktur bawah jembatan. In Construction and Material Journal. http://jurnal.pnj.ac.id/index.php/cmj
Pratama, H., Aminullah, A., & Handayani, T. N. (2025). Implementation of Building Information Modeling (BIM) for Bridge Abutment Cost Estimation Considering QTO Validity. Eduvest-Journal of Universal Studies, 5(5), 4870–4885. http://eduvest.greenvest.co.id
PUPR. (2018). Modul_5- Pemodelan 3D-7D simulasi dan LOD.
Putra, A. A. P., Oei, N. I. W., Hermawan, & Hasiholan, B. (2022). Comparative Study in Bill of Quantity Estimates on Reinforcement Works of Pile Cap, Single Pier and Double Pier of Flyover between Conventional Methods and BIM (Building Information Modelling). IOP Conference Series: Earth and Environmental Science, 1065(1). https://doi.org/10.1088/1755-1315/1065/1/012041
Richintya, A., Suharyanto, A., & Rachmansyah, A. (2024). Readiness of contractor companies to implementation building information modelling in East Java Province. AIP Conference Proceedings, 3043(1). https://doi.org/10.1063/5.0207333
Saavedra, R., Meléndez, W., & Garcés, G. (2025). Comparative analysis of quantity take-off in concrete, steel bars and formwork in apartment buildings based on cad and bim methodologies. Journal of Information Technology in Construction, 30, 159–184. https://doi.org/10.36680/j.itcon.2025.008
Soon, L. T., Wong, L. S., Kamarazaly, M. A., Saar, C. C., & Ilmi, H. S. (2024). Comparison of bim-based quantities take-off in quantity surveying profession. Journal of the Malaysian Institute of Planners, 22(3), 150–164. https://doi.org/https://doi.org/10.21837/pm.v22i32.1499
Vassen, S. A. (2021). Impact of BIM-based Quantity Take off for Accuracy of Cost Estimation. International Journal of Construction Engineering and Management, 10(3), 55–69. https://doi.org/10.5923/j.ijcem.20211003.01
Wang, K., Guo, F., Zhang, C., & Schaefer, D. (2024). From Industry 4.0 to Construction 4.0: barriers to the digital transformation of engineering and construction sectors. Engineering, Construction and Architectural Management, 31(1), 136–158. https://doi.org/10.1108/ECAM-05-2022-0383
Wibowo, R. A., Dwiyana, P. A., & Susanti, J. E. (2025). Comparative Analysis of Concrete QTO Using BIM and Conventional on XYZ Project. G-Tech: Jurnal Teknologi Terapan, 9(4), 2141–2150. https://doi.org/10.70609/g-tech.v9i4.8075
Yin, L. K., & Mei, L. K. (2023). Building Information Modeling-Based Approach for Automatic Quantity Take-off and Cost Estimation.pdf. International Journal of Civil and Environmental Engineering, 2(17), 80–97. https://doi.org/https://doi.org/10.48084/etasr.9890
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Vendie Abma, Tri Nugroho Sulistyantoro, Fitri Nugraheni

This work is licensed under a Creative Commons Attribution 4.0 International License.