Abstract

The efficiency of a work system can be influenced by several factors, namely the operator and machine capacity in the production process. The line balancing method is the right method to increase the efficiency of a work system. From the various work stations, the researchers balanced the processing time of the work stations so that each line of work stations could complete quickly, thereby reducing waiting time. In this research, the researcher started the activity by collecting data from each work station in the process of making the Harrington Jacket which was produced by CV. 913 productions. From the results of the data obtained. Researchers processed data using Bill of Materials (BOM), Process Plan Sheet (LRP), Precedence Diagram, Assembly Chart, and Operation Process Chart (OPC). In order for the production process to be very efficient, methods are needed. The methods used are the Ranked Positional Weight (RPW) method, the Mirror RPW method, the Largest Candidate Rule (LCR) method, the J.Wagon method and the Region Approach method.

References

Azwir, H. H., & Pratomo, H. W. (2017). Implementasi Line Balancing untuk Peningkatan Efisiensi di Line Welding Studi Kasus: PT X. Jurnal Rekayasa Sistem Industri, 6(1). https://doi.org/10.26593/jrsi.v6i1.2428.57-64

Bowo, D. S. (2018). ANALISIS PERBAIKAN PROSES PRODUKSI PADA PT SUMBER TEKNIK SENTOSA. Jurnal Manajemen Bisnis, 8(1), 19–28. https://doi.org/10.22219/jmb.v8i1.7049

Dharmayanti, I., & Marliansyah, H. (2019). Perhitungan Efektifitas Lintasan Produksi Menggunakan Metode Line Balancing. Jurnal Manajemen Industri dan Logistik, 3(1), 43–54. https://doi.org/10.30988/jmil.v3i1.63

Dinanty, Y. D., & Batubara, S. (2016). Perancangan Sistem P-Kanban Dan C-Kanban Untuk Meminimasi Keterlambatan Material Pada Lini Produksi Perakitan Laundry System Business Unit (Lsbu) Di Pt. Y. Jurnal Teknik Industri, 6(3), 242–251. https://doi.org/10.25105/jti.v6i3.1549

Ikhtisholiyah, L. (2017). Analisis penerapan Manajemen waktu dan Biaya pada Proyek pembangunan Gedung Kuliah Teknik Listrik Industri Politeknik Negeri Madura (Poltera). In Zeta-Math Journal, 3(1) , 14–21.

Islaha, A. F., & Cahyana, A. S. (2017). Upaya Peningkatan Produktivitas Dengan Meminimasi Waste Menggunakan From To Chart (FTC). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 1(2), 107–115. https://doi.org/10.21070/prozima.v1i2.1289

Kedar, S., Mujumdar, S., Patil, C., & Niturkar, P. (2017). Effects of BOM mismatch on procuring material for customized product based companies. International Journal of Current Engineering and Technology, 7(7), 140–143.

Kristianto, A., Reza, V., & Kurniawan, B. (2015). Analisa Keseimbangan Lintasan Dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Studi Kasus PT. D. Journal Industrial Servicess, 1(1). https://doi.org/10.36055/jiss.v1i1.295

MU, W., ZHOU, C., BO, H., & LIANG, J. (2017). A Bill of Material Transformation Method for Design-Manufacturing Integration. DEStech Transactions on Engineering and Technology Research, 10. https://doi.org/10.12783/dtetr/icamm2016/7395

Sikorra, J. N., Friedewald, A., & Lödding, H. (2016). Early estimation of work contents for planning the one-of-a-kind production by the example of shipbuilding. MATEC Web of Conferences. https://doi.org/10.1051/matecconf/20167701025

Siswiyanti, S., & Rusnoto, R. (2018). Penerapan Ergonomi pada Perancangan Mesin Pewarna Batik untuk Memperbaiki Postur Kerja. Jurnal Optimasi Sistem Industri, 17(1), 75–85. https://doi.org/10.25077/josi.v17.n1.p75-85.2018

Sofyan, D., Syariffudin, Meutia, S., & Islamiyati. (2019). Penyeimbanagn Lintasan Produski Vulkanisir Ban Dengan Metode Large Candidate Rule ( Lcr ). Jurnal Optimalisasi, 5(1), 32–44. https://doi.org/10.35308/jopt.v5i1.819

YU, J., Subramanian, N., Ning, K., & Edwards, D. (2015). Product delivery service provider selection and customer satisfaction in the era of internet of things: A Chinese e-retailers’ perspective. International Journal of Production Economics, 159, 104–116. https://doi.org/10.1016/j.ijpe.2014.09.031

Yulianti, D. (2018). Analisa Penyeimbangan Lintasan Perakitan Pada Proses Pembuatan T-Shirt Di Departemen Assembling Dengan Menggunakan Metoda Hegelson - Birnie Dan Metoda Killbridge – Wester Pt. Caladi Lima Sembilan (C-59) Bandung. Jurnal Tekno Insentif, 12(2), 13–20. https://doi.org/10.36787/jti.v12i2.70

Published

2024-01-15

How to Cite

Analisis Perancangan Stasiun Kerja dalam Memproduksi Produk Inalcafa Jacket dengan Lima Metode Line Balancing. (2024). G-Tech: Jurnal Teknologi Terapan, 8(1), 546-553. https://doi.org/10.33379/gtech.v8i1.3854

Most read articles by the same author(s)