Usulan Penerapan Contractor Safety Management System Pada Tahap Pra Kualifikasi di PT. UES Menggunakan Gap Analysis

Authors

  • Yulizan Rizki Universitas Teknologi Nusantara, Indonesia
  • Rani Aulia Imran Universitas Jenderal Soedirman, Indonesia
  • Katon Muhammad Universitas Jenderal Soedirman, Indonesia
  • Harun Indra Kusuma Universitas Teknologi Nusantara, Indonesia
  • Ahmad Faisal Ridho Universitas Jenderal Soedirman, Indonesia

DOI:

https://doi.org/10.33379/gtech.v8i3.4617

Keywords:

CSMS, Gap Analysis, Construction

Abstract

PT. UES, a construction service company, is preparing to participate in the prequalification stage of the Contractor Safety Management System (CSMS) for project tenders. This research aims to measure the implementation of CSMS during the prequalification stage using the gap analysis method. This method compares data sets to identify gaps. The research methodology includes distributing questionnaires to relevant respondents and reviewing the company's safety documents. The results show a compliance percentage of 73%, indicating gaps between the company's CSMS implementation and the standards set by the employer, thus necessitating improvements in the company's CSMS implementation

References

Ahmad, A., Daud, A., & Khurniawan, A. W. (2024). The Effect of Servant Leadership, Employee Engagement and Work Stress on Work Safety with Contractor Safety Management System (CSMS) Mediation in the Oil and Gas Industry. Jurnal Ekonomi, 13(01), 2442-2456.

Amelia, T. W. & Luqmantoro, 2018. Penerapan Contractor Safety Management System Pada PT Jamin Jaya Abadi di Balikpapan. Jurnal Ilmiah Keselamatan, Kesehatan Kerja dan Lindungan Lingkungan, 4(1).

Anjani, F., & Wondabio, L. S. (2023). Analisis Persiapan Persiapan Implementasi PSAK 74 pada Perusahaan Asuransi Indonesia (Studi Kasus pada Perusahaan Asuransi X). Owner: Riset dan Jurnal Akuntansi, 7(2), 1026-1035.

Anthony, J. E., Tafrikhatin, A., & Waluyo, A. (2021). eSurMent: An Educational Institution Services Customer Satisfaction Measurement (CSM) Mobile Application Evaluation Tool using Opinion Mining with Sentiment Analysis. Jurnal E-KOMTEK (Elektro-Komputer-Teknik), 5(1), 13-20.

Hermawan, N. S. A. (2020). Analisi Implementasi Contractor Safety Management System (CSMS) Pada Tahap Pelaksanaan Pekerjaan Proyek Kapal Tanker Di PT. Daya Radar Utama Unit Lampung Tahun 2019. Jurnal Ilmu Kesehatan Masyarakat Indonesia (JIKMI), 1(1).

Juniarti, S., 2022. Gambaran Potensi Bahaya dan Kecelakaan Kerja serta Analisis Penilaian Risiko di. Jurnal Persada Husada Indonesia, p. 13.

Lala, Y. F. M. A., 2021. Penerapan Constractor Safety Management System (CSMS) Dan Dasar Hukumnya Di PT. Pertamina Refinery Unit VI Balongan. Jurnal Indonesia Sosial Teknologi, 2(12), pp. 2723-2745.

Muliawati, R., Hermawan, N. S. A. & Sunaryo, R. A., 2020. Analisi Implementasi Contractor Safety Management System (CSMS) Pada Tahap Pelaksanaan Pekerjaan Proyek Kapal Tanker Di PT. Daya Radar Utama Unit Lampung Tahun 2019. Jurnal Ilmu Kesehatan Indonesia (JIKMI), 1(1).

Picard, A, R., B, B. & S, C., 2018. Measuring readiness for compliance: A gap analysis tool to complete the TIPA process assessment framework. springer international publishing switzerland, p. 106.

Pratama, A. A., Imtihan, M., & Nugroho, S. (2020). Analisis Defect Pada Proses Stranding Dengan Metode Dmaic Pt. X. JENIUS: Jurnal Terapan Teknik Industri, 1(2), 58-66.

Ramli, S., 2017. Manajemen Keselamatan Proses Berbasis Risiko (Risk Based Process Safety Management) untuk Industri Migas dan Petrokimia.. Jakarta: Yayasan Pengembangan Keselamatan Prosafe Institute.

Rusba, k. et al., 2022. Contractor Safety Management System (CSMS). Jurnal Pengabdian Masyarakat, 1(2), pp. 69-73.

Shafly, M. F., Sawiji, H., & Susantiningrum, S. Analisis Kepuasan Pelanggan Di PT. Comunikasi Selaras Mandiri (CSM) pada tahun 2020. JIKAP (Jurnal Informasi dan Komunikasi Administrasi Perkantoran), 7(3), 184-189.

Suery, Z. A., Kurniawan, B., & Ekawati, E. (2016). Analisis Implementasi Contractor Safety Management System (Csms) Pada Tahap Persiapan Kerja Di Coca Cola Amatil Indonesia (Ccai) Semarang. Jurnal Kesehatan Masyarakat, 4(3), 646-656.

Suprianto, S. (2024). Analisis Kekuatan Kapal Fiberglass Yang Menggunakan Material Multiaxial (Studi Kasus Pembuatan Sekoci Km. Sabuk Nusantara 78 Di Pt. Orela Shipyard). JUSTI (Jurnal Sistem dan Teknik Industri), 4(3), 351-356.

Tahapari, Y., Nugroho, A. S. B., & Suparma, L. B. (2021). Model Estimasi Biaya Dengan Cost Significant Model Dan Artificial Neural Network Proyek Peningkatan Jalan Aspal Di Yogyakarta. Jurnal Teknik Sipil, 16(2), 122-133.

Tualeka, A. R., Pujiantara, A. R. F., & Robby, B. (2023). Analysis of the Effect of Contractor Safety Management System (CSMS) on Health and Safety Culture at PT. Indocement Tunggal Prakarsa Tbk. Syntax Literate; Jurnal Ilmiah Indonesia, 8(6), 4648-4665.

Wardhani, Y. D. K. (2022). Implementation of Contractor Safety Management System as a Requirement for Partners at a Petrochemical Company. The Indonesian Journal of Occupational Safety and Health, 11(1), 1-11.

Zahran, M. F. (2024). Green Accounting Practices for Corporate Sustainability. Jurnal Ilmiah Manajemen Ekonomi Dan Akuntansi (JIMEA), 1(3), 127-138.

Published

2024-07-05

How to Cite

Usulan Penerapan Contractor Safety Management System Pada Tahap Pra Kualifikasi di PT. UES Menggunakan Gap Analysis. (2024). G-Tech: Jurnal Teknologi Terapan, 8(3), 1959-1968. https://doi.org/10.33379/gtech.v8i3.4617