Crawler Crane Productivity Analysis on Erection Girder Work for Toll Road Construction Solo - Yogyakarta

Authors

  • Astuti Umasugi Institut Teknologi Nasional Yogyakarta, Indonesia
  • Sely Novita Sari Institut Teknologi Nasional Yogyakarta, Indonesia
  • Rizal Maulana Institut Teknologi Nasional Yogyakarta, Indonesia

DOI:

https://doi.org/10.70609/gtech.v9i1.6034

Keywords:

Productives, Erections, Cranes, Load Charts

Abstract

The construction of the Solo–Yogyakarta Toll Road aims to enhance connectivity between Solo and Yogyakarta and reduce traffic congestion. This study examines the productivity of crawler cranes in girder erection work to provide recommendations for optimizing crane usage in similar projects and improving construction efficiency. A quantitative approach was used, analyzing technical parameters such as lifting capacity, load charts, and operational safety, in accordance with SNI 6910-2022 standards. The findings revealed that the IHI CCH2800 crawler crane, with a maximum capacity of 280 tons, successfully handled a total load of 44.61 tons using a lifting frame. With a Dynamic Amplification Factor (DAF) of 1.05, the crane achieved a safe lifting capacity of 46.84 tons. The optimal configuration included a boom length of 33.50 meters, a lifting radius of 13 meters, and a sling capacity of 182.72 tons, resulting in a maximum lift capacity of 82.3 tons. This study highlights the importance of accurate lifting radius calculations and load chart optimization to ensure productivity and operational safety. The findings offer practical recommendations for application in future large-scale infrastructure projects.

References

ASME. (2014). ASME B30.9-2014: Slings. New York: The American Society of Mechanical Engineers. Retrieved from https://ipieco.ir/wp-content/uploads/2018/05/ASME-B30.9-2014.pdf

Deng, Z. ., Gao, Q. ., Dong, H., & Li, L. . (2019). Dynamic responses of the shallow foundation of an onshore wind turbine. International Journal of Physical Modelling in Geotechnics, 19(5), 247–260. https://doi.org/10.1680/jphmg.17.00078

Dewantari, R. ., & Rasidi, N. (2023). Comparison of Implementation Methods of PCI Girder Erection on Broken Bridge 2 of the Solo-Yogyakarta Toll Road Project. Online Journal of Construction Engineering Management Thesis (JOS-MRK), 4(3), 130–135. Retrieved from http://jurnal.polinema.ac.id/index.php/jos-mrk/article/view/3414

DNV-OS-H205. (2014). Offshore Standard DNV-OS-H205—Lifting Operations. Oslo, Norway.

Fortuna, B.I., Sucita, I.K., & Rizal, R. S. (2021). Time and Cost Analysis of Erection Box Girder Comparison Using Crane and Launcher Method. Scientific Journal of Civil Engineering, 18(2), 100–112. https://doi.org/10.30630/jirs.v18i2.627

Hasdian, E., Maulana, M. A., & Fertilia, N. C. (2021). Analysis Comparissons of Erection Girder Implementations Methods Using Launcher Gantry and Crawler Crane Based on Cost and Time:(Case Study: Cimanggis-Cibitung Toll Road Project Section II Cibubur Area). ADRI International Journal of Sciences, Engineering and Technology, 6(2), 78–88. Retrieved from https://pdfs.semanticscholar.org/3fe2/4e3c6c0f63172362f1cb295f7d5bf9e4af44.pdf

Izza, F. K., Praditama, M. A., Kirana, C. N., Setyono, K. J., & Sudarmono, S. (2019). Study of the Completion Time of the Crane Method and the Launcher Method in the Implementation of Bridge Girder Erection (Case Study: Construction of the Semarang-Solo Toll Road Salatiga-Boyolali Section Sta 40+ 409–Sta 71+ 785). Civil Journal Forum; Journal of Civil Engineering Development, 24(1), 47–59. http://dx.doi.org/10.32497/wahanats.v24i1.1606

Jaya, W., Sutandi, A. (2019). Productivity Analysis of Heavy Equipment Auger Drilling Machines, Crawler Cranes, and Excavators in Projects a and b. JMTS: Journal of Civil Engineering Partners, 11–18. https://doi.org/10.24912/jmts.v2i1.3030

Kamila, A. A. (2022). Analisis Perbandingan Biaya Dan Waktu Erection Slab On Pile Antara Metode Launching Gantry Dan Crawler Crane (Comparative Analysis Of Cost And Time Of Erection Slab On Pile Between Launching Gantry And Crawler Crane Methods)(Studi Kasus Pembangunan. Retrieved from https://dspace.uii.ac.id/handle/123456789/38677

Kato Works Co., L. (n. d. . (n.d.). CCH2800 Crawler Crane Specifications. Diakses dari https://www.kato-works.co.jp/china/products/crawler_crane/hicom_pdf/CCH2800.pdf

Laksmiwati, A. I. (2023). Implementation Method and Productivity of Crawler crane in Steel Girder Erection Work (Case Study: Intake Service Bridge, Tamblang Dam). (Doctoral Dissertation, Gadjah Mada University). Accessed from https://etd.repository.ugm.ac.id/penelitian/detail/229886

Lee, D. ., Kang, J. ., Kim, T., Oh, C., Kim, J., & Kim, J. (2021). Analysis of roller load by boom length and rotation angle of a crawler crane. Journal of the Korean Society of Manufacturing Process Engineers, 20(3), 83–91. https://doi.org/10.14775/ksmpe.2021.20.03.083

Li, J., Bai, L., Gao, W., Shi, N., Wang, N., Ye, M., & Liu, J. (2021). Reliability-based design optimization for the lattice boom of crawler crane. In Structures. Elsevier, 29, 1111–1118. https://doi.org/10.1016/j.istruc.2020.12.024

Lin, G. Y., Li, Z. Y., Wang, Z. G., & Li, K. X. (2015). A Calculation of the Crawler Crane Boom System′ s Dynamic Load in the Lifting Process. Journal of Northeastern University (Natural Science), 36(5), 699–703. 10.12068/j.issn.1005-3026.2015.05.020

Maddeppungeng, A., Asyiah, S., Intari, D. E., Hakim, B. I., & Setiawati, D. N. (2023). Analysis of Heavy Equipment Productivity Tower Crane in The Construction Project of Sultan Maulana Hasanudin State Islamic University Building. Fondasi: Jurnal Teknik Sipil, 12(2), 147–183. http://dx.doi.org/10.36055/fondasi.v12i2.21982

Shaikh, A. A. (2016). ifting capacity enhancement of a crawler crane by improving stability. Journal of theoretical and applied mechanics. 54(1), 219–227. 10.15632/jtam-pl.54.1.219

Siswanto, A. B., Salim, M. A., & Nurwidiyanti, A. (2022). Comparative Analysis of Erection Girder Beam Work with Launcher and Crawler Crane Method for the Batang Integrated Industrial Estate Project. Journal of Civil Engineering, 15(2), 23–36. https://doi.org/10.56444/jts.v15i2.217

Standard, B. (2002). Terminations for steel wire rope-Safety. Badan Standardisasi Nasional, EN 13414. Retrieved from https://growsafehse.com/wp-content/uploads/2024/05/BS-EN-13411-3-2004Terminations-For-Steel-Wire-Ropes-Safetys-min.pdf

Umar, A. R., & Naibaho, P. R. T. (2022). Comparative Analysis of the Implementation of Erection Girder Underpass on National Roads with Crane Method and Launchere Method. Asian Journal of Mechatronics and Electrical Engineering, 1(1), 1–12. https://doi.org/10.55927/ajmee.v1i1.1122

Wahidin, F. N. (2017). Implementation Method and Analysis of Crawler Crane Productivity in Erection Girder Construction Overpass Interchange Construction Project Solo-Ngawi Toll Road Construction Pt. Waskita Karya (Persero) Tbk. (Doctoral Dissertation, Gadjah Mada University). Retrieved from https://etd.repository.ugm.ac.id/penelitian/detail/115009

Downloads

Published

2025-01-06