Study of the Causes of Change Orders in Infrastructure Work Implementation and its Impact on Project Performance

Authors

  • Moh. Sholahuddin Universitas Bojonegoro, Indonesia
  • Ichwan Hadi Saputra Universitas Bojonegoro, Indonesia

DOI:

https://doi.org/10.70609/gtech.v9i3.6919

Keywords:

Change Order, Factors, Impact, Infrastructure

Abstract

Infrastructure work often undergoes changes during the construction phase to adapt to field conditions that differ from the initial planning. These changes may involve adding work volume, modifying technical specifications, or adjusting work schedules due to field conditions, policy changes, or other external factors. If not managed properly, these changes can lead to cost overruns, project delays, and even disputes among the parties involved. This research aims to identify the factors causing changes in orders and their impact on project performance. The method used is the distribution of questionnaires to involved contractors, followed by data analysis using the Relative Importance Index (RII) approach. The results show that there are 7 main factors, namely Planning and Design, Natural Factors, Owners, Construction, External Causes, Administration, and Policy Changes, with 40 indicators causing changes in orders in infrastructure projects. Additionally, it was found that changes in orders impact project performance in terms of cost, quality, and time, with 15 indicators representing those impacts. This finding makes an important contribution to project management practices, particularly in efforts to control changes in work during construction execution. The results of this research can serve as a basis for consideration in planning, monitoring, and decision-making to minimize the risks of work changes and improve overall project performance.

References

Anitabella, Cicha Ajeng, Meriana Wahyu Nugroho, and Titin Sundari. (2024). “IDENTIFIKASI PENYEBAB CONTRACT CHANGE ORDER ( CCO ) DAN PENGARUHNYA TERHADAP PELAKSANAAN ( STUDI KASUS : RUMAH SAKIT BHAYANGKARA TK III NGANJUK ).” 04(02):83–93.

Desai, J.N., Pitroda, J., (2015) A Review on Change Order and Assessing Causes Affecting Change Order in Construction, Journal of International Academic Research for Multidisciplinary, Vol. 2, No. 12. Engineering, Civil, and Journal Sciej. 2022. “Sultra.” 3(1):9–17.

Dewantoro. (2017). “Penyebab Dan Pengaruh Contract Change Order Pada Proyek Peningkatan Jalan (Studi Kasus Paket Kegiatan Jalan Pasar Panas-Bentot 2 Multiyears),” J. Teor. dan Terap. Bid. Keteknikan, vol. 1, hal. 11–19.

D. Muh, “Faktor penyebab dan dampak change order pada konstruksi bangunan air,” vol. 4, no. 01, hal. 7–18, 2018.

Fisk, E. R., & Reynolds, W. D. (2006). Construction project administration (8th ed.). Wiley New York

Hansen, S., Rostiyanti, S. F., & Rif’at, A. (2020). Causes, Effects, and Mitigations Framework of Contract Change Orders:Lessons Learned from GBK Aquatic Stadium Project. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 05019008. https://doi.org/10.1061/(asce)la.1943- 4170.0000341

Hardjomuljadi, S. (2016). Variation order, the causal or the resolver of claims and disputes in the construction projects. International Journal of Applied Engineering Research, 11(14), 8128– 8135.

Harviyanti, Enny, and Yoga Astanu Pasa. (2022). “Analisa Faktor Yang Berpengaruh Terhadap Terjadinya CCO (Contract Change Order) Pada Proyek Pembangunan Laboratorium Fisika SMA 1 Sekatak.” Jurnal Sains Benuanta 1(2):1–8. doi: 10.61323/jsb.v1i2.52.

Ida Ayu Rai Widhiawati, Anak Agung Wiranata, and I Putu Yudha Wirawan. (2016). “Faktor-Faktor Penyebab Change Order pada Proyek Konstruksi Gedung”. Jurnal Ilmiah Teknik Sipil A Scientific Journal of Civil Engineering. Vol. 20, No. 1.

Indramanik. (2019). “Pengaruh Faktor Penyebab Change Order Terhadap Waktu Pelaksanaan Proyek Konstruksi Gedung Di Kabupaten Badung,” hal. 16–31.

I. R. H. Putri dan M. Waty. 2021. “Penyebab Change Order Pada Proyek Konstruksi Bangunan Air Wilayah Dki Jakarta,” JMTS J. Mitra Tek. Sipil, vol. 4, no. 1, hal. 249, doi: 10.24912/jmts.v0i0.10289

Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and change orders on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2(2), 89–96. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000016

Khalef, R., El-adaway, I. H., Assaad, R., &Kieta, N. (2021). Contract Risk Management: A Comparative Study of Risk Allocation in Exculpatory Clauses and Their Legal Treatment. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(1), 04520036. https://doi.org/10.1061/(asce)la.1943-4170.0000430

Kosasi, Michael Halmar, Andi Andi, and Lie Arijanto. (2019). “Analisa Aspek-Aspek Dalam Prosedur Change Order Pada Proyek Konstruksi.” Dimensi Utama Teknik Sipil 6(1):9–16. doi: 10.9744/duts.6.1.9-16.

Lakauni Junius, Alexander, and Mega Waty. (2020). “Dampak Change Order Pada Proyek Perkerasan Jalan.” JMTS: Jurnal Mitra Teknik Sipil 3(1):199. doi: 10.24912/jmts.v3i1.7023.

Levy, S. M. (2002). Project management in construction. McGraw-Hill New York, NY.ct management in construction. New York: McGraw-Hill New York, NY.

Martanti, Ana Yuni Yuni. (2019). “Analisis Faktor Penyebab Contract Change Order Dan Pengaruhnya Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Pemerintah.” Rekayasa Sipil 7(1):32. doi: 10.22441/jrs.2018.v07.i1.03.

Mastin, J. M., Nelson, E. L., & Robey, R. G. (2019). Smith, Currie & Hancock’s Common Sense Construction Law: A Practical Guide for the Construction Professional. John Wiley & Sons

Mega Waty, and Hendrik Sulistio. (2021). “Change Order Dan Risiko Change Order Pada Proyek Jalan Di Jawa Barat.” PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 10(1):124–41. doi: 10.22225/pd.10.1.2387.124-141.

Michella Beatrix, dkk. 2014 “analisa pengaruh change order terhadap biaya, waktu, dan mutu proyek konstruksi di Surabaya” Program Study Pasca Sarjana Teknik Sipil, Jurusan Teknik, Institut Sepuluh November.

Mirnawati, Nur Haidah, and Juherah. (2023). “Hubungan Perilaku Masyarakat Dengan Kondisi Sanitasi Dasar Di Kelurahan Antang Makassar.” Sulolipu: Media Komunikasi Sivitas Akademika Dan Masyarakat 23(2):280–86. doi: 10.32382/sulo.v23i2.87.

Muluk, Mafriyal, Merley Misriani, Jajang Atmaja, Syaifullah Ali, and Mona Monica. (2018). “Identifikasi Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Jalan Di Sumatera Barat.” Jurnal Ilmiah Rekayasa Sipil 15(2):77–87. doi: 10.30630/jirs.15.2.126.

Murtopo, Ali, Agung Nugroho, and M. Arief Budihardjo. (2023). “Kajian Contract Change Order (CCO) Pada Proyek Pembangunan Laboratorium Terpadu Universitas Tidar.” Reviews in Civil Engineering 6(2):46–52. doi: 10.31002/rice.v6i2.335.

M. Waty dan H. Sulistio. (2020). “Perhitungan Change Order Proyek Jalan Di Banten,” J. Muara Sains, Teknol. Kedokt. dan Ilmu Kesehat., vol. 4, no. 2, hal. 211, doi: 10.24912/jmstkik.v4i2.6342.

Putri, Ivana Ramayanti Hendratno, and Mega Waty.(2021). “Penyebab Change Order Pada Proyek Konstruksi Bangunan Air Wilayah Dki Jakarta.” JMTS: Jurnal Mitra Teknik Sipil 4(1):249. doi: 10.24912/jmts.v0i0.10289.

Rohana, Novia Siti, Rahmad Fadillah Rasul, R. Dzaki Mandala Putra, Alifta Rossela, Yayuk Setyaning Astutik. (2018). Teknik Sipil, Universitas Internasional, Teknik Sipil, Universitas Internasional, Teknik Sipil, Universitas Internasional, Teknik Sipil, Universitas Internasional, Teknik Sipil, and Universitas Internasional. “Analisa Faktor-Faktor Penyebab Change Order.” 3(2):1–10.

Suseno, Ahmad, Amris Azizi, and Arif Kurniawan Suksmono. (2024). “Dampak Contract Change Orders (Cco) Terhadap Produktivitas Proyek Konstruksi Di Kabupaten Cilacap the Impact of Contract Change Orders (Cco) on Productivity of Construction Project in the Cilacap Districts.” Hal 5(1):15–20.

Sutra, Diana, Anton Soekiman, and Felix Hidayat. (2022). “Identifikasi Faktor Penyebab Dan Dampak Change Order Pada Pelaksanaan Proyek Bidang Sumber Daya Air.” Jurnal Aplikasi Teknik Sipil 20(3):291. doi: 10.12962/j2579-891x.v20i3.12533.

S. Gumolili, B. Sompie, dan J. Rantung. (2012). “Analisa Faktor-Faktor Penyebab Change Order Dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek Konstruksi Di Lingkungan Pemerintah Provinsi Sulawesi Utara,” J. Ilm. Media Eng., vol. 2, no. 4, hal. 98522.

Tsarwan, Oties T., and Yunita Dian Suwandari. (2019). “Analisis Change Order Terhadap Performa Proyek Analysis of Factors Affecting Change Order and The Impact on Project.” Prosisding Seminar Nasional 1(1):197–202.

Wardani, A. A. A. M. C., Laintarawan, I. P., & Arianta, I. G. A. (2023). Analisis Faktor Penyebab Contract Change Order (CCO) Terhadap Proses Pelaksanaan Pembangunan Gedung Rumah Sakit Kabupaten Bangli. Widya Teknik, 19(1), 1–9. https://doi.org/10.32795/widyateknik.v19i1.4143

Waty, M., & Sulistio, H. (2021). Change Order Dan Risiko Change Order Pada Proyek Jalan Di Jawa Barat. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 10(1), 124–141. https://doi.org/10.22225/pd.10.1.2387.124-141

Downloads

Published

2025-07-02

How to Cite

Study of the Causes of Change Orders in Infrastructure Work Implementation and its Impact on Project Performance. (2025). G-Tech: Jurnal Teknologi Terapan, 9(3), 1113-1122. https://doi.org/10.70609/gtech.v9i3.6919

Most read articles by the same author(s)