Analysis of Material Procurement Process with Simulation Approach in LN Companies

Authors

  • Muhammad Ali Institut Teknologi Kalimantan, Indonesia
  • Christopher Davito Prabandewa Hertadi Institut Teknologi Kalimantan, Indonesia
  • Happy Aprillia Institut Teknologi Kalimantan, Indonesia
  • Muqimuddin Muqimuddin Institut Teknologi Kalimantan, Indonesia

DOI:

https://doi.org/10.33379/gtech.v8i3.4444

Keywords:

Material Procurement, Inventory, Resources, Scenarios, Utilities

Abstract

In the material procurement process, there are often delays in the arrival of materials that cause maintenance and operational delays. Evaluation of the material procurement process is necessary to identify the factors that cause delays. Utility and waiting time for various staff showed significant variations, with the highest waiting time at the approving stage (4-24 hours) and the creation of TOR, FPB, RAB documents (1-11 hours). Utilization at the FPB, TOR, RAB creation staff from 13% to 62%, RO staff 6%-55%, HPE staff 50%-77%, RKS staff 10%-52%, approving user team, assistant manager to manager of 73%-90%, PDP staff 0%-45%, HPS staff 0%-45%, PPP staff 0%-44%, entry staff 61%-81%, eval staff 4%-41%, BA staff 0-56%, PO staff 8-52%. Three improvement scenarios were developed, with scenarios 2 and 3 being the best, scenario 2 reducing resources and scenario 3 increasing the purchase of certain materials, in order to optimize inventory.

References

Ahmad, A. (2016). Antrian Kapal Pengangkut. Analisis Sistem AntrianKapal Pengangkut Barangdi Pelabuhan Tanjung Perak Surabaya, 5(2337–3520), 17.

Altiok, T., & Benjamin, M. (2007). SIMULATION MODELING AND ANALYSIS WITH ARENA (1st ed.). Elsevier B.V.

Apriyani, N., & Muhsin, A. (2017). Analisis Pengendalian Persediaan Bahan Baku Dengan Metode Economic Order Quantity Dan Kanban Pada Pt Adyawinsa Stamping Industries. Opsi, 10(2), 128. https://doi.org/10.31315/opsi.v10i2.2108

Arifin, M. (2009). SIMULASI SISTEM INDUSTRI (1st ed.).

Bagus, H., Langgeng, S., Nuha, H., & Murnawan, H. (2022). Analisis Sistem Antrian Pelayanan Bongkar Muat Kapal Tongkang Batu Bara pada Mother Vessel untuk Meminimalisir Waktu Bongkar Muat pada PT. Handil Bhakti Persada. Menur Pumpungan, Kec. Sukolilo, Kota SBY, 45(2), 1.

Basuki, Prawoto, A. T., & Nano. (2016). Bagian Pertama : Pengantar Ekonomi Mikro. Pengantar Teori EKonomi, 1–405.

Fauziah, Agustina, I., & Andryana, S. (2012). Analisis Implementasi Random Number Generate ( Rng ) Pada Simulasi Antrian Menggunakan Aplikasi Berbasis . Net Framework. Semnasif, 2012(Number Generate (RNG)), 32–36.

Ginting, M. H. (2023). Media Pembelajaran Penggunaan Software Arena. Journal of Research and Investigation in Education, 12–17. https://doi.org/10.37034/residu.v1i1.7

Hamdy, M. I., & Masari, A. (2020). Penerapan Re Order Point (ROP) dan Safety Stock pada Pengadaan Chemical Demulsifier dan Chemical Reverse Demulsifier. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 5(2), 87. https://doi.org/10.24014/jti.v5i2.8998

Harahap, N. S., Nababan, E., & Rosmaini, E. (2018). Analisis Kinerja Antrian Pelanggan Restoran Cepat Saji (Studi Kasus : Kfc Jln. Gajah Mada, Medan, Sumatera Utara). Talenta Conference Series: Science and Technology (ST), 1(1), 032–037. https://doi.org/10.32734/st.v1i1.186

Hillier, F., & Lieberman, G. (2001). INTRODUCTION TO OPERATIONS RESEARCH (7th ed.). McGraw-Hill.

Kelton, W. D. (2007). Simulation With Arena (4th ed.). McGraw-Hill.

Pattiapon, M. L. (2015). Peningkatan Kinerja Perusahaan dengan Menggunakan Metode Supply Chain. Arika, 9(1), 1–10.

Pratama, R. K., Karim, A. A., & Hertadi, C. D. P. (2023). Perencanaan Stok Pengaman dan Titik Pemesanan Ulang dengan Metode Time Series pada Perusahaan Furniture Di Kalimantan. Jurnal Teknologi Dan Manajemen Industri Terapan, 2(3), 200–211. https://doi.org/10.55826/tmit.v2i3.256

Pujawan, N., & Mahendrawathi. (2017). SUPPLY CHAIN MANAGEMENT (Maya (ed.); 3rd ed.).

Purwanto, T. A. (2021). Analisis Sistem Antrian Menggunakan Software Simulasi Arena Pada PT Indomobil Trada Nasional (Nissan Depok). Jurnal IKRA-ITH INFORMATIKA, 5(2), 1–12. https://journals.upi-yai.ac.id/index.php/ikraith-informatika/article/view/998

Ramdhany, T. (2020). Perancangan Sistem Informasi Pengadaan Material Berbasis Komputer Pada Bagian Pengadaan Logistik Di Pt. Pln (Persero) J&P Unit …. Jurnal Komputer Bisnis, 096, 27–33. http://jurnal.lpkia.ac.id/index.php/jkb/article/view/258

Rohmawati, S. (2023). The Simulation SIMULASI MODEL SISTEM PELAYANAN TRUCK PADA PROSES MUAT PUPUK DENGAN MENGGUNAKAN SOFTWARE ARENA UNTUK MENGOPTIMALKAN FASILITAS PELAYANAN (Studi Kasus: Gudang Multiguna (GMG) PT Petrokimia Gresik). JUSTI (Jurnal Sistem Dan Teknik Industri), 3(2), 204. https://doi.org/10.30587/justicb.v3i2.4957

Sanggala, E., Mulyati, E., Rahma, N., Putri, D., & 2019. (2019). Analisis Sistem Antrian Untuk Menentukan Jumlah Operator Angkut Yang Optimum Dengan Metode Teori Antrian Untuk Meminimalkan Waktu Keterlambatan Pengiriman Kantong Surat Dan Barang Prioritas Di Pt. Pos Indonesia (Persero) Kantor Mail Processing Center (Mpc. Jurnal Logistik Bisnis, 09(02), 105–111. http://ejurnal.poltekpos.ac.id/index.php/logistik/index

Sugiartio, F. & B. J. L. (2012). Implementasi Simulasi Sistem untuk Optimasi Proses Produksi pada Perusahaan Pengalengan Ikan.

Zulmy Alhamri, R., & Dianta, A. F. (2017). Model Simulasi Sistem Dinamik Estimasi Potensi Energi Panas Bumi Metode Volumetrik Studi Kasus Gunung X. Jurnal Informatika Dan Multimedia, 09(01), 1–9. http://ojs.poltek-kediri.ac.id/index.php/JIM/article/view/101

Published

2024-07-03

How to Cite

Analysis of Material Procurement Process with Simulation Approach in LN Companies. (2024). G-Tech: Jurnal Teknologi Terapan, 8(3), 1605-1614. https://doi.org/10.33379/gtech.v8i3.4444

Most read articles by the same author(s)