Analysis of Cost Budget Plans in Disaster Logistics Warehouse Planning of the Badan Penanggulangan Bencana Daerah (BPBD) Bantul Regency, D.I. Yogyakarta

Authors

  • Alfinur Insaniyati Umi Sa'adah Institut Teknologi Nasional Yogyakarta, Indonesia
  • Sely Novita Sari Institut Teknologi Nasional Yogyakarta, Indonesia
  • Rizal Maulana Institut Teknologi Nasional Yogyakarta, Indonesia

DOI:

https://doi.org/10.70609/gtech.v9i1.6033

Keywords:

Budget, Cost, Warehouse, Logistics

Abstract

From the various roles of the Bantul Regency BPBD in managing disaster preparedness and response in the Bantul area, which is known to be prone to disasters, the construction of a disaster logistics warehouse is needed to support the implementation of disaster management. To ensure the effectiveness and efficiency of the construction of the warehouse, an analysis of the Cost Budget Plan (CBP) is needed. The purpose of this study is to analyze the costs needed to complete the construction of the Bantul Regency BPBD logistics warehouse. The types and sources of data used are secondary data in the form of floor plan drawings, cut drawings, and detailed drawings. The method carried out is by analyzing the price of the unit of work using the applicable units of goods and services. CBP is obtained from the product of the volume of work multiplied by the result of the unit price of work. CBP analysis on the Bantul BPBD Logistics Warehouse Planning was obtained of Rp 20,026,590,027. The results of this study help to ensure appropriate budget allocation, prevent cost overruns, and become the main guideline in project implementation to support effective disaster response by BPBD.

References

Alami, N., Aziz, U. A., & Margiarti, D. (2021). A comparative study of cost budget plans between the Work Unit Price Analysis Method (EUPA) and the Indonesian National Standard (SNI).Surya Beton: Journal of Civil Engineering,5(1), 10-19. Retrieved from https://core.ac.uk/download/pdf/480700507.pdf

Dewi, C. P., Esfianto, A., & Alwi, S. (2016). Calculation of the Budget Plan, Cost and Time for the Implementation of Work on the Construction of a Multipurpose Building on Jalan Tomo, Samarinda, East Kalimantan. Journal of Inertia, 8(1), 57-66. Retrieved from https://ejurnal.polnes.ac.id/index.php/inersia/article/view/804

Jacobus, A. S., Arsjad, T. T., & Walangitan, D. R. O. (2022). Budget Plan for the Construction of the Isolation Building of Buluye Napoa'e Moutong Hospital, Central Sulawesi. TEKNO, 20(81), 409-418. https://doi.org/10.35793/jts.v20i81.43683

Lengkong, S. C., Sabijono, H., & Tirayoh, V. Z. (2021). Analysis of Project Planning and Cost Control at PT. Marga Dwitaguna. EMBA Journal: Journal of Economic Research, Management, Business and Accounting,9(3), 1069-1076. https://doi.org/10.35794/emba.v9i3.35292

Malaiholo, D., Kurniawan, M. A., & Wardani, H. (2021). Budget Plan for Planning the Construction of the Upper Structure of the Railway Bridge at PPI Madiun.Bearing: Journal of Civil Engineering Research and Studies,6(4), 226-232. https://doi.org/10.32502/jbearing.3217202064

Mokolensang, V. M., Arsjad, T. T., & Malingkas, G. Y. (2022). Analysis of the Cost Budget Plan on the Papua 1 Flats Construction Project in Muara Tami District, Jayapura City, Papua Province. Static Civil Journal, 9(4), 619-624. Retrieved from https://ejournal.unsrat.ac.id/index.php/jss/article/view/38957

Nawal, C., Doloksaribu, B., & Paresa, J. (2022). Calculation of Cost Budget Plans and Implementation Methods in Replanning Steel Structure Buildings. Musamus Journal of Civil Engineering, 4(2), 95-104. https://doi.org/10.35724/mjce.v4i02.4410

Rahmah, S., & Ikhsan, I. (2022). Disaster Management in Post-Disaster Handling of BPBD West Aceh Regency. Journal of Social Politics and Governance (JSPG), 4(1), 24-37. https://doi.org/10.24076/JSPG.2022v4i1.776

Sari, S. N., Triwuryanto, T., & Ramadhanti, A. T. (2022). Calculation of the Draft Budget for the Kalirejo Village Embankment, Kulon Progo DIY. Jompa Abdi: Journal of Community Service, 1(2), 32-40. http://dx.doi.org/10.55784/jompaabdi.Vol1.Iss2.73

Sembiring, D. P. E. (2020). Design of a Cost Budget Plan (CBP) Calculation Application for House Construction Using the Burgerlijke Open Bare Werken (BOW) Method.Pelita Informatics: Information and Informatics,5(3), 16-20. Retrieved from https://www.stmik-budidarma.ac.id/ejurnal/index.php/pelita/article/view/249

Sinambela, E. A., & Djaelani, M. (2021). Analysis of Cost Planning Designs with Real Cost Calculation Methods in the Implementation of Simple Housing Projects. Journal of Trends Economics and Accounting Research, 2(2), 32-36. Retrieved from https://journal.fkpt.org/index.php/jtear/article/view/229

Sukardi, N. I., Canra, D., Konoras, A., & Ridho, M. (2020). Disaster Logistics Management and Distribution System Case Study for Earthquake Disaster Management in South Halmahera. Journal of Science and Engineering, 3(1), 33-37. https://doi.org/10.33387/josae.v3i1.3029

Sumantri, M. F., Arsjad, T. T., & Malingkas, G. Y. (2022). Calculation of the cost and implementation budget plan in the construction project of the Bolaang Mongondow Regional Inspectorate Office Building.Techno,20(82), 607-619. https://doi.org/10.35793/jts.v20i82.44154

Sumartini, W. O., & Sanjaya, F. (2023). Comparative Analysis of the Budget Plan for the Construction of Residential House Foundation Floors from an Economic Perspective (Case Study: Palm Spring Housing Batam City).Journal of Civil Engineering,12(2), 83-91. https://doi.org/10.36546/tekniksipil.v12i2.830

Toea, J. Y. (2023). Calculation of Cost Budget Plans and Implementation Methods for Time Efficiency with the Critical Path Method in the Elim Kolaka Church Building Construction Project. Doctoral dissertation, Sintuwu Maroso University. Retrieved from http://repository.unsimar.ac.id/id/eprint/1800

Wijanarko, R. (2022). The Effectiveness of the Role of Regional Disaster Management Agencies in Distributing Logistics Assistance to Flood Disaster Victims in Tanjungpinang City, Riau Islands Province. Doctoral dissertation, Institute of Domestic Government. Accessed from http://eprints.ipdn.ac.id/8333/

Downloads

Published

2025-01-06

How to Cite

Analysis of Cost Budget Plans in Disaster Logistics Warehouse Planning of the Badan Penanggulangan Bencana Daerah (BPBD) Bantul Regency, D.I. Yogyakarta. (2025). G-Tech: Jurnal Teknologi Terapan, 9(1), 229-238. https://doi.org/10.70609/gtech.v9i1.6033

Most read articles by the same author(s)

1 2 > >>