Study on the Influence of Weather Factors on Construction Delays of Retaining Walls in Market Projects

Authors

  • Junita Eka Susanti Institut Teknologi Sumatera, Indonesia

DOI:

https://doi.org/10.70609/gtech.v9i2.6698

Keywords:

Weather, Project delays, Construction, Retaining walls, Risk management

Abstract

Weather is an external factor that significantly influences the implementation of construction projects, especially in open environments. This research aims to evaluate the impact of weather, particularly rainfall, on delays in retaining wall construction projects in market areas. The study employs statistical analysis of historical weather data, an assessment of work progress realization, and interviews with project implementers. The analysis reveals that rainfall, both drizzle and heavy rain, affects work productivity differently. During the project timeline, rain occurred for 17 days in October (48 hours), 21 days in November (74 hours), and 7 days in December (20 hours). In the first month, progress exceeded the planned schedule with a positive deviation of 4.25%. However, in the second month, adverse weather conditions and other technical factors contributed to a negative deviation of 6.88%. Despite this setback, work progress recovered in the third month, ultimately reaching the targeted 100% completion. Regression analysis confirms that heavy rain significantly hampers construction activities more than drizzle. Significant tasks, such as the construction of retaining walls, come to a complete halt during heavy rain, whereas drizzle still allows work to proceed, albeit with reduced productivity. These findings underscore the necessity of integrating weather risk assessments into project planning to develop more resilient scheduling strategies and minimize potential delays.

References

Achiari, H., & Maini, M. (2020). Culvert Bridge Remediation Final Report.

Aman, M., & Siregar, J. (2023). Analisis Deviasi Kemajuan Pekerjaan Berdasarkan Persentase Durasi Waktu pada Pekerjaan Konstruksi Bangunan. Menara: Jurnal Teknik Sipil, 18(1). https://doi.org/10.21009/jmenara.v18i1.29213

Battaineh, H. T., & Odeh, A. M. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1).

Camilleri, M., Jaques, R., & Isaacs, N. (2001). Impacts of climate change on building performance in New Zealand. Building Research and Information, 29(6). https://doi.org/10.1080/09613210110083636

Crawl, D. B. (2008). Estimating the impacts of climate change and urbanization on building performance. Journal of Building Performance Simulation, 1(2). https://doi.org/10.1080/19401490802182079

Das. (2013). Principles of Geotechnical Engineering. In Journal of Chemical Information and Modeling (Vol. 53, Issue 9).

Das, B. M., & Sobhan, K. (2012). Principles of Geotechnical Engineering, Eight Edition. In Cengage Learning (Vol. 5, Issue 1).

de Wilde, P., & Coley, D. (2012). The implications of a changing climate for buildings. In Building and Environment (Vol. 55). https://doi.org/10.1016/j.buildenv.2012.03.014

He, Y., Li, B., & Du, X. (2023). Soil Slope Instability Mechanism and Treatment Measures under Rainfall—A Case Study of a Slope in Yunda Road. Sustainability (Switzerland) , 15(2). https://doi.org/10.3390/su15021287

Hope, P., Wang, G., Lim, E.-P., Hendon, H., Grose, M., Black, M., Pepler, A., Dowdy, A., & Arblaster, J. (2018). Seasonal prediction framework for attribution of extreme events in a changing climate. Ensemble Methods: Nowcasting to Climate Change - Abstracts of the Bureau of Meteorology Annual R&D Workshop, 26th November to 30th November 2018, Melbourne, Australia; Bureau Research Report - 30.

Jalali, Z., Shamseldin, A. Y., & Ghaffarianhoseini, A. (2023). Impact assessment of climate change on energy performance and thermal load of residential buildings in New Zealand. Building and Environment, 243. https://doi.org/10.1016/j.buildenv.2023.110627

Kanavaris, F., Azenha, M., & Shingo, A. (2024). Temperature-Time Effects on Properties of Concrete Materials and Structures. Journal of Advanced Concrete Technology, 22(Special_Issue). https://doi.org/10.3151/jact.22.s1

Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1). https://doi.org/10.1016/S0263-7863(00)00037-5

Schuldt, S. J., Nicholson, M. R., Adams, Y. A., & Delorit, J. D. (2021). Weather-related construction delays in a changing climate: A systematic state-of-the-art review. In Sustainability (Switzerland) (Vol. 13, Issue 5). https://doi.org/10.3390/su13052861

Sheikh, M. R., Nakata, Y., Shitano, M., & Kaneko, M. (2021). Rainfall-induced unstable slope monitoring and early warning through tilt sensors. Soils and Foundations, 61(4). https://doi.org/10.1016/j.sandf.2021.05.010

Wang, W., Watkin, A., Jones, D., Ganter, C., Duell, R., Gamble, F., Pollock, J., & Chandler, E. (2018). Summary of POAMA operational climate forecast services of Australian Bureau of Meteorology: 2013-2018. Ensemble Methods: Nowcasting to Climate Change - Abstracts of the Bureau of Meteorology Annual R&D Workshop, 26th November to 30th November 2018, Melbourne, Australia; Bureau Research Report - 30.

Downloads

Published

2025-04-10

How to Cite

Study on the Influence of Weather Factors on Construction Delays of Retaining Walls in Market Projects. (2025). G-Tech: Jurnal Teknologi Terapan, 9(2), 809-818. https://doi.org/10.70609/gtech.v9i2.6698

Most read articles by the same author(s)